My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2012-015
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2012
>
Ord 2012-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2014 1:42:19 PM
Creation date
4/6/2012 3:40:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2012-15
Date
4/3/2012
Volume Book
194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SAN MARCOS ELECTRIC RULES AND REGULATIONS <br />For the purpose of calculating charges, each meter on the customer's premises will be <br />considered separately, and the consumptions recorded by two or more meters will not be <br />combined except as follows: <br />(a) Where the combination of metered consumptions are specifically provided <br />for in rate schedules. <br />(b) Where the maintenance of adequate service and /or where the city's operating <br />convenience shall require the installation of two or more meters upon the <br />customer's premises instead of one meter. <br />INTERRUPTION OF SERVICE <br />A. The City will exercise reasonable diligence and care to avoid any interruption of <br />or reduction in the delivery of electricity. The City shall not be liable for any <br />damages or claims arising from any failure to deliver electric power and energy to <br />the customer, which failure in any way or manner results from failure of its <br />facilities, however caused, or from failure of any supplier to provide necessary <br />products, materials or services necessary to the continuity of electric service. <br />B. The City, whenever it shall find it necessary for the purpose of making repairs or <br />improvements to its system, will have the right to interrupt temporarily the <br />delivery of service. Normally, when a primary distribution line clearance is <br />needed, reasonable notice will be given to the customers of the proposed <br />interruption when it occurs other than under emergency conditions. The city <br />considers notice to customers by way of public media to be a reasonable notice. <br />The making of such repairs as practicable, to cause the least inconvenience to the <br />customer. <br />CITY ' S RIGHT TO ACCESS TO CUSTOMER'S PREMISES <br />The City shall have the right to access to the customer's premises for any purpose <br />reasonably connected with the furnishing of electricity to its customers. <br />The City shall have the right to remove its property installed on the customer's premises at <br />the termination or discontinuance of service. <br />SERVICE CONNECTIONS MADE BY CITY <br />Only duly authorized employees of the City are allowed to connect the Customer's <br />service to or disconnect the same from, the City power line. <br />CHANGES IN RATES, RULES AND REGULATIONS <br />The rates, rules and regulations contained in this tariff may be changed from time to time. <br />New rates, rules and regulations shall become effective on the date specified thereon and <br />shall on that date alter, amend, supersede or replace as the case may be, any existing rates, <br />rules, and regulations. <br />REFUSAL OF SERVICE <br />Compliance by Applicant <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.