My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-032
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2012 11:04:28 AM
Creation date
4/19/2012 8:44:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-32
Date
4/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br />This Agreement is effective April 17 ' 9012 between the City of <br />San Marcos, Texas, a home -rule municipal corporation, (the "City "), 630 East Hopkins, San <br />Marcos, Texas 78666 and Alan Plummer Associates, Inc. (the "Engineer "), 6300 La Calma, <br />Suite 400, Austin, Texas 78752 -3825, for the Engineer's provision of professional engineering <br />services in connection with the Harmons Way- Oakridge Supply Line (the "Project "). <br />The City and the Engineer agree as follows: <br />ARTICLE I <br />ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br />A. The term of this Agreement begins on the effective date established above and will end <br />upon the Engineer's completion, and the City's acceptance of all services included in this <br />Agreement. The Engineer agrees to provide the City with the services described in Attachment <br />A, Scope of Services, which is incorporated herein by reference for all intents and purposes, and <br />which services may be more generally described as follows: Design, bidding, and construction <br />phase services for the installation of approximately 10,350 linear feet of 12 -inch water line and <br />3,650 linear feet of 8 -inch water line in Hunter Road and Harmons Way for this Project. <br />B. The Engineer understands that time is of the essence and agrees to provide all design <br />work and professional services in the most expedient and efficient manner possible in order to <br />complete the Project by: 730 calendar days in accordance with the approved Project schedule <br />included in this Agreement as Attachment B. <br />C. The Engineer will not subcontract any work under this Agreement without prior written <br />approval from the City. In the event approval is given by the City, the Engineer will specify the <br />appropriate insurance requirements and miscellaneous provisions by separate written agreement <br />with the subcontractor. <br />D. The Engineer will perform all of its services in coordination with the City. The Engineer <br />will advise the City of data and information the Engineer needs to perform its services and the <br />Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />E. Stephen J. Coonan, P.E. is the Engineer's Project Representative assigned to this Project. <br />The Engineer will not substitute another representative for this Project unless approved in <br />writing by the City in advance of such proposed substitution. In the event the City and the <br />Engineer cannot agree to the substitution of the Project Representative, the City may terminate <br />this agreement. <br />F. The City will designate and notify the Engineer of its designation of an authorized Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.