My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-138
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2006 9:31:04 AM
Creation date
8/23/2006 9:30:17 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-138
Date
7/12/1999
Volume Book
137
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STANDARD RATE SCHEDULE <br />(Labor Rate Table 34) <br /> <br />Effective August 1, 1998, the following rates are recommended for work performed on an hourly-charge <br />basis. Rates include company overhead and profit for services accomplished during regular working <br />hours. <br /> <br />DIRECT LABOR <br /> <br />OFFICE PERSONNEL SERVICES <br /> <br />Classification ~ <br />Project Engineer .. ..... ...... ............. ......... .................. ...... ........ ....... .......... ...... ...... $100.00 per hour <br />Staff Engineer ...... .... ....... ............. ......... .............. ........... ...... ........... ..................... $85.00 per hour <br />Project Surveyor . ....... ..... ..... ......... ........ ............... ......... ............... .................. ...... $80.00 per hour <br />Project Designer/Coordinator ...... ........... ............. ........... ............. ........................ $70.00 per hour <br />Staff SurveyorlEngineering Assistant! GPS Processor ....................................... $65.00 per hour <br />Senior Engineering/Surveying CAD Technician/Designer ................................. $55.00 per hour <br />Engineering/Surveying/CAD Technician/Designer ....... ....... .............................. $50.00 per hour <br />CAD Draftsman/Field Representative ...... ............. ......... ....... .......................... .... $45.00 per hour <br /> <br />Secretary .... ....... ................ ............. ............. ........... ......... ....... ....... ....................... $45.00 per hour <br /> <br />Expert WitnessrrestimonylDeposition Services .............. ..... ....... .................... Two Times Rates <br />Principal (as appropriate) ........................... ................ ...... ..... ....... .................... $120.00 per hour <br /> <br />FIELD PARTY SERVICES ~ <br />l-Man Field Party . .............. .............................................. ....... .......................... $ 65.00 per hour <br />2-Man Field Party . ....... ....... ............. ........... ............. ......... ....... .......................... $ 90.00 per hour <br />3-Man Field Party . ....... ....... ............. ........... ............. .....~... ....... ..... ..................... $110.00 per hour <br />4-Man Field Party . ....... .................. ............. ...................... ....... ..... ..................... $130.00 per hour <br />GPS Field Unit with Operator (Note 5) ............................ ....... .......................... $100.00 per hour <br />GPS Field Unit without Operator (Note 5) ............. ......... ............ ....................... $60.00 per hour <br /> <br />DIRECT EXPENSES <br /> <br />Transportation: <br />By Firm's Passenger Vehicles (Note 1) ............................................................. $ 0.35 per mile <br />By Firm's Survey Trucks (Notes 1, 2, 3 & 4) .................................................... $ 0.35 per mile <br />Subsistence of Out-of-City Work .. ......... ........................................ .......................... $100.00 per day <br />Reproduction & Printing by Firm, . ......... ............. ............. ................ ....................... Prevailing Com- <br />Survey Stakes, Lathes, Iron Rods ....................................... ....... ........................ mercial Rates Or <br />and other Direct Expense......... ......... ............. ...................... ..... .......................... Cost, Plus 10% <br /> <br />~: <br />1. A mileage charge will be billed for projects exceeding a 50-mile radius of the base office only. <br />2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of <br />stakes, lathes, etc., used such as during the construction phase of a project will be charged as <br />indicated. <br />3. A minimum of two (2) hours field party time charge will be made for show-up time and return to <br />office, resulting from inclement weather conditions, etc. <br />4. Field Party stand-by time will be charged for at the above-shown appropriate rates. <br />5. Rates apply to actual time GPS units are in use. All other time will be charged at appropriate <br />normal field party rates. <br />6. The firm's professional liability is limited to the total amount of compensation associated with a <br />specific project up to a maximum of $50,000. <br /> <br />10. IBaker-AICklen <br />I~~ & Associates, Inc. <br />Engineers/Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.