My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-149
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2006 11:33:14 AM
Creation date
9/5/2006 11:30:46 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Construction Contract
Number
1999-149
Date
8/9/1999
Volume Book
137
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />· BRYAN CONSTRUCTION COMPANY <br /> <br />. <br /> <br />BOX 4087, 1400 EAST BYPASS, BRYAN. TEXAS 77805 (409) 776-6000 FAX (409) 776.6008 <br /> <br />Attachment "A" <br /> <br />July 15, 1999 <br /> <br />Odor Control Improvements at City of San Marcos WWTP <br /> <br />BRYAN CONSTRUCTION COMPANY will furnish materials, labor and <br />equipment to construct the Odor Control system as shown with the <br />following clarifications and or exclusions: <br /> <br />Sheet C-l -> EF-l to be as proposed by Air Moving Equipment Co., <br />see attached proposal # 8459 <br />-> AC-1 to be Grainger stock # 5F233, see attached <br />-> the intake air hoods are excluded <br /> <br />Sheet M-1 -> the HDPE Liner is 60 mil Herculine Liner, see <br />attached proposal from In-Line Plastics, Co. <br />-> the 20" PVC duct is Schedule 40 <br />-> the FRP Header is 24" <br />-> the 3ea Bay Headers are 14" including BF Valve <br />~> the perforated headers are 8" <br />-> piping and valves are as proposed by u.S. Filter, <br />see attached proposal <br />-> adder for PVC Butterfly Valves is $9,680.00 <br /> <br />Sheet E-1 -> electrical to be as proposed by Crouch Industries, <br />Sheet E-2 see attached proposal <br /> <br />General: <br /> <br />1. This proposal excludes all paintiag <br />2. This proposal is valid for 20 days <br />3. This work will require approximately 90 calendar days from <br />award <br />4. Electrical shop drawings must be returned within 9 days <br />5. Equipment and piping shop drawings are excluded <br />
The URL can be used to link to this page
Your browser does not support the video tag.