Laserfiche WebLink
<br />CHANGE ORDER NO. 1 <br /> <br />PRCkT-Ec:.r: Odor Control Irnprovernents <br />CITY OF SAN MARCOS, TEXAS <br /> <br />CONTRACTOR: Bryan Construction Cornpany <br />CONSULTANT: Carnp Dresser & McKee Inc. <br />DATE: Novernber 3, 1999 <br /> <br />CHANGE OR EXTRA WORK TO BE PERFORMED <br /> <br />Delete treated lurnber divider walls ................... $(4,570.00) <br />Add 4"+/- layer of Wood Mulch Chips (rnax 50cy)......... $ 1,900.00 <br />Add 12 ea 4" PVC Cleanouts @ air laterals ............. $ 2,740.00 <br />Raise 20" air line to CL elevation of 572.75 .......... $( 560.00) <br />Add 1 ea 2" Condensate Drain @ 24" blind flange ....... $ 568.00 <br />Add 2 ea 2" ports @ Hurnidifer nozzle .................. $ 430.00 <br /> <br />TOTAL. INCREASE/DECREASE $ 508.00 <br /> <br />Previous Contract Amount <br />Net increase/decrease in Contract Amount <br />Revised Contract Amount <br />Net increase/decrease in Contract Time (days) <br />Revised Contract Time (days) <br /> <br />$ 205,265.00 <br />508.00 <br />205,773.00 <br />o <br />90 <br /> <br />Recommended by: <br /> <br />CONSULTANT: <br /> <br />by: <br /> <br /> <br />Approved by: <br /> <br />CITY OF SAN MARCOS <br /> <br />CONTRACTOR: <br /> <br />bY:~4#~ <br />Bob ell lei~" liP, <br />Printed name, title <br /> <br />~/d~ <br />Larry D. <@lley/La . a Huffman <br />City Manager/Asst--. ity Manager <br />