My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-149
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2006 11:33:14 AM
Creation date
9/5/2006 11:30:46 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Construction Contract
Number
1999-149
Date
8/9/1999
Volume Book
137
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sent ~y: C~ouch Industries, LLC; <br /> <br />512 386 5010; <br /> <br />Jul-14-99 3:02PM; <br /> <br />Page 2/2 <br /> <br />CROUCH <br />--.lNIJlJSIRIES L~ <br /> <br />Scope of'\Vork Sheet E-2: <br />. Per note 1, wiring will be terminalt:d and labeled as noted. <br />. Per note 2, use existing spare Dr and DO points for monitoring and contrcl of the exhaust fan <br />and compressor. <br />. Per note 3t upgrade the existing screen on the OWS to add the cdar control exhaust fan, air <br />compressor, and associated monitoring and control functions. <br />· Per note 4. Add the 01 and DO points to the database and existing reports. <br />. Per note 5. update the existing PLClPC documents ta add the DilDO points. <br />. Per note 6, insta1l30A dual circuit breaker unit in MCC-SOOtc feed EF-l and AC-l. <br />. Pcr note 7, EXCEPT/ON is taken tc terminating the control wires in the MCC section prior <br />to routing ta PLC-500. The dual circuit breaker unit will not have room for the terminal strips <br />that '1.\;11 be required for this installation. <br /> <br />Lump sum cost for the installed work is $27,390. Tax is fiat included in the qllatcd price. <br />Estimated lead time far equipment deliveries i~ approximately four weeks. Estimated time to <br />execute the work after materials are on site is apprcximately fcur weeks. <br /> <br />Thank you for the .opportunity tc pravide this quatatian. please call if 1 may be of any further <br />assistance. <br /> <br />Sincerely: <br />Crouch Industries, LLC <br /> <br />~~- <br /> <br />Farrell R. Prewitt <br />Project Manager <br /> <br />P,O. Box 14Dl;S5 Auslin, TcXllS 78714-0855 <br />Phone (512) 3~6-5000 <br /> <br />Page 2 <br /> <br />1106 Smith Road. Stc 100 Au.,tin, Texas '/8721 <br />Fa" (512) 3&6-5010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.