My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1999-188
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1999
>
Res 1999-188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2006 11:55:41 AM
Creation date
9/6/2006 11:54:36 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1999-188
Date
9/27/1999
Volume Book
138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3.1.2 The construction cost will include at current market rates, including a reasonable <br />allowance for overhead and profit, the cost of any equipment which has been designed, <br />specified, selected or specially provided for by the Consultant, except that used materials <br />and equipment will be included as if purchased new for the Project. <br /> <br />3.1.3 Construction cost does not include the compensation of the Consultant and the <br />Consultant's consultants, or other costs which are the responsibility of the City as provided <br />in Article 2. <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 Evaluations ofthe City's Project budget and detailed cost estimates, if any, prepared <br />by the Consultant, will represent the Consultant's best judgment as a design professional <br />familiar with the construction industry. <br /> <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Consultant. The Consultant will be permitted to <br />include contingencies for design, bidding and price escalation, to determine what materials, <br />equipment, and types of construction are to be included in the construction contract <br />documents, to make reasonable adjustments in the scope of the Project and to include in <br />the construction contract documents alternate bids to adjust the construction cost to the <br />fixed limit. The fixed limit of construction cost may be increased by the City. <br /> <br />3.2.3 If the lowest bona fide bid exceeds the Consultant's most recent approved cost <br />estimate established as a condition of this Agreement, the City will (1) give written approval <br />of an increase in such fixed limit, (2) authorize rebidding of the Project within a reasonable <br />time, or (3) cooperate in revising the Project scope and quality to reduce the construction <br />cost. During the development of the Project through the phases described by Article 1 of <br />this Agreement and prior to the City's final approval of construction contract documents, <br />the Consultant will monitor the established probable construction cost in relation to the <br />established fixed limit. <br /> <br />If necessary, the Consultant will implement construction cost savings measures or <br />otherwise endeavor to limit probable construction cost to the level of available funds set <br />by the City. <br /> <br />ARTICLE 4 <br />PAYMENTS TO THE CONSULTANT <br /> <br />4.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES <br /> <br />4.1.1 Payments for Basic Services will be made to Consultant monthly following receipt <br />by City of Consultant's invoices. The amounts of these invoices will be based upon the <br />extent of work completed by the Consultant on a percentage basis within each phase of <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.