Laserfiche WebLink
<br />- Yes -:-';0 <br /> <br />Does the site have an underground storage tank') <br />- Yes - .-":0 <br /> <br />[1' your an'....er is 'YES to any of the above questions. u;,e current techniques by qualilid profess!\)nah to undenake investip. <br />tions determined necessary and comply with ~ 50.3(il. <br /> <br />Are there any unresolved concerns that could lead to HL'D being determined to be a Potential Responsible Pany (PRP)') <br />- Yes -:-';0 <br /> <br />Comment:-. <br /> <br />Source documentation: (attach ~ 55.20 analysis for new construction and/or fillin:>\ <br /> <br />Other <br />a. Endangered Species (see EF 3.4 of Handbook 1390.2) <br /> <br />Has the Deparunent of Interior list of Endangered Species and Critical Habitats been reviewed? <br />- Yes - ~o <br /> <br />[s the project likely to affect any listed or proposed endangaed or threatened specIes or critical habitats) <br />- '{e~ - ~() <br /> <br />If your answer is YES. compliance is required with Section 7 of the Endangered Species Act. \l. hich mandates consul,alion <br />with the Fish and Wildlife Service in order to preserve the species. <br /> <br />Comments: <br /> <br />Source documentation: <br /> <br />b. Sole Source aquifers <br />Will the proposed project affect a sole source or other aquifer? <br />. . Yes CJ No <br /> <br />Comments: <br /> <br />Sou rce documentation: <br /> <br />c. Farmlands Protection (see EF 3.3 of Handbook 1390.2) <br />If the site or area is presently being farmed. docs the project 'Confor.n with the F.l:':nland Protection PolIcv Act and HLD <br />policy memo? <br />- Yes - No <br />- - <br />If your answer is YES. compliance is required with 7 CFR Pan 658. Depanmenr of ..i"griculture regulations implementin~ <br />the Act. <br /> <br />Comments: <br /> <br />Source documentation: <br /> <br />d. Flood Insurance <br />Is the building located or to be located within a Special flood Huard :~rea iden::tied on a current flood Insurance Ra,e <br />\1ap (F1R\1)? <br />-Yes-No <br />- - <br />If your answer is YES. tlood insurance protection is required for buildings located or to be located within a Special FlocJ <br />Hazard Area as a condition of approval of the project. In addition. compliance with ~ 55.12 and the tloodplain manage. <br />ment decisionmaking process (~ 55.20) is required. (refer to item #17 above). Document the map used to determine <br />Special Flood Hazard Area in abo~e item #] 7 pertaining to community name and number. map panel number and date 0;' <br />map panel. <br /> <br />6 <br />