Laserfiche WebLink
<br />1. Alternative studies evaluation/selection <br />2. Construction and right-of-way cost estimates <br /> <br />IV. PREPARE DESIGN SCHEMATIC (Phase II) <br />A. 1 Survey and provide horizontal and vertical control using NAD 83 (English) <br />datum <br />2. Set flight panels for aerial photography <br />3.0btain planimetric and topographic data <br />B. Defme existing right-of-way and other property lines required to accurately <br />establish roadway alignments. <br />c. Prepare design schematic of Preferred Alternative on controlled planimetric and <br />topographic mapping utilizing GEOP AK. The design schematic will include the <br />following: <br />1. Finalize typical sections including pavement design <br />2. Finalize horizontal alignments <br />3. Finalize vertical alignments <br />4. Finalize earthwork design (develop design cross sections to identify right- <br />of-way or retaining wall requirements) <br />5. Determine right-of-way requirements <br />6. Prepare traffic diagrams <br />7. Display ownership information <br />8. Display utility locations <br /> <br />PUBLIC INVOLVEMENT & TEAM COORDINATION (Function Code 120) (phases <br />1&10 <br /> <br />I. IN FOMIA TIONAL MEETINGS <br />A. Prepare meeting displays and exhibits <br />B. Attend Stakeholders Meeting and Committee Workshops <br />C. Attend one City Public Meeting and one Public Hearing <br />D. Attend 18 Team Meetings <br /> <br />PAGE 11 OF 15 OF <br />EXHIBIT 1 <br />