My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-042
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2006 4:13:30 PM
Creation date
9/11/2006 4:11:48 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-42
Date
2/23/1998
Volume Book
132
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTACHMENT B <br /> <br />ADS SCOPE OF WORK <br />GARY JOB CORPS CENTER <br />AND <br />THE CITY OF SAN MARCOS AIRPORT <br /> <br />A. MobiJization and ProJect Management <br /> <br />UfJCJ{1 receipt of a Nab ro Proc:eea. ADS will schedule field personnel. mobnize the <br />orojed. It!arn and arrange 10r a formal project kidc-<)ff m9Gdng to be held within 10 days <br />of the NotJ~ to P~ed with the OWNER's staff, establishing the lines of <br />communication ~Id provfdJog Input regarttrng hIstorical information a$ it relate$ to the <br />current project SCOpe. A project schedule will be submitted for review and approval by <br />the OWNER at ~ kidc.-off meeting. prelininary intonnation to be obtained from the <br />OWNER may inc(udu~ but not be lmIted to, reports of previous studicG. coIJe(;tion <br />system maps. and ~ ~r U$aOfI Md treatment plant record$. Previous reports <br />wiD be reviewed to prU'lide a better undetstandilg of historical c:onditions i'l the <br />wastewater collection system. It is 1YPteal tor ii project Of this type ~d tQOpo. to locate <br />additional fines and ITlilt!holes UlfUUghout the collection system. These adcfltion:1l items <br />will be invoiced at their respective unit costs. <br /> <br />General Administration <br /> <br />General 3.dmtnlstraticn wm include deveioprTttmt of internal filing systems for incoming <br />field data including flow monitoring data. smoka lming resutts, ~te. Periodic project <br />update meetings with the OWNER wiU be conducted so that the pmject sct\edules and <br />budgets are proJ:.cny tracked and ml\intained. <br /> <br />Prclaet R.viElw and Qumity .l$$urance Program <br /> <br />As p_rt of a ql.laJity assurance program. lIow monitoring d4la wiU be ver1f1en throUgh the <br />use of insitu field hydraulic eciibrations using Independent equipment. V8Jnr.ity profiles <br />of each flow mer.itomg location will be undertaken to verify sile hyttrauIJcs. 01 Iring the <br />course of the project. daia coUccted by the flow mete~ will be compared to manual <br />r4l!adings'taken by ADS p4i)/'IOnnel ~t ~ site. Both a ~hical and tabular review of <br />the da!;. will be provided. <br /> <br />Ounng ~l"Ie fasid InvQStigations of this projact traffic eontrol for the public.: safely wlll tie <br />maintained. The dIsruption of traffic Will ~ minimized. ADS will a~ide by the tlClfrlC <br /> <br />G.~Al.l.J.SICC~.r:r......,.cA!:t"- ooc <br /> <br />6 <br /> <br />Maren 2'3. , ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.