My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-059
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 3:42:13 PM
Creation date
6/12/2012 3:06:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-059
Date
6/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />City of San Marcos <br />2012 Lift Station Condition Assessment <br />Scope of Services <br />1. Lift Station Condition Assessment Meeting <br />Conduct meeting to discuss condition and criticality (consequence of failure) prioritization <br />strategies and desired level of service. Scoring parameters and weighting factors will be <br />discussed. <br />2. Lift Station Site Visits <br />FNI will visit critical lift stations to assess the condition of the facility. Data sheets will be <br />compiled documenting the condition of each parameter being evaluated such as pumps, <br />electrical, structural, and other physical data. <br />3. Assign Condition and Criticality Scores <br />Assign a condition score to each lift station based on site visits, maintenance history, staff input, <br />and previous studies. Assign criticality score based on parameters such as population served, <br />system redundancy, and environmental impact as determined in Task 1. <br />4. Risk Based Scoring <br />FNI will utilize the condition and consequence of failure scores to develop renewal risk ratings <br />for lift stations. The resulting risk ratings will be used to prioritize lift station renewal projects. <br />5. Develop Recommended Lift Station Improvements <br />FNI will develop improvements to lift stations to address deficiencies or condition issues. Cost <br />estimates will be developed for the recommended projects to be programmed into the City's <br />overall wastewater capital improvements plan. <br />6. Condition Assessment and Risk Based Renewal Technical Memorandum <br />Prepare and submit five (5) copies of the Condition Assessment and Risk Based Renewal of Lift <br />Stations Technical Memorandum. The memorandum will include documentation of site visits, <br />scoring parameters, weighting factors, and recommendations. <br />7. Project Meeting and Finalize Technical Memorandum <br />FNI will meet with the City to present and discuss results of the lift station condition assessment. <br />FNI will solicit comments and make revisions to the technical memorandum. Five (5) copies of <br />the Final Condition Assessment and Risk Based Renewal of Lift Stations Technical <br />Memorandum will be submitted. <br />WW Master Plan Engineer Services (Engineering Services) — May 2012 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.