My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-059
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 3:42:13 PM
Creation date
6/12/2012 3:06:24 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2012-059
Date
6/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT C <br />COMPENSATION <br />Compensation to Freese and Nichols shall be based on the following Schedule <br />of Charges: Not to Exceed: The total fee for Basic Services in Attachment <br />SC shall be computed on the basis of the Schedule <br />of Charges, <br />but shall not exceed Fifty ThreeThousand Five Hundred Thirty One Dollars ($53,531). If <br />FNI sees the Scope of Services changing so that Additional Services are <br />needed, including but not limited to those services <br />described as <br />Additional <br />Services in Attachment SC, FNI will notify OWNER <br />for OWNER's approval before proceeding. Additional Services shall <br />be computed based on the <br />Schedule of Charges. <br />Schedule of Charges: <br />Position <br />Min <br />Max <br />Position <br />Min <br />Max <br />PRINICIPAL <br />176.80 <br />416.52 <br />3D VISUALIZATION COORDINATOR <br />137.03 <br />177.33 <br />GROUP MANAGER <br />178.20 <br />300.55 <br />ENVIRONMENTAL SCIENTIST VII <br />171.33 <br />234.51 <br />ENGINEER VIII <br />217.99 <br />276.81 <br />ENVIRONMENTAL SCIENTIST VI <br />146.08 <br />189.05 <br />ENGINEER VII <br />189.87 <br />245.72 <br />ENVIRONMENTAL SCIENTIST V <br />130.17 <br />168.46 <br />ENGINEER VI <br />166.34 <br />233.83 <br />ENVIRONMENTAL SCIENTIST IV <br />105.30 <br />157.21 <br />ENGINEER V <br />136.38 <br />195.73 <br />ENVIRONMENTAL SCIENTIST III <br />94.80 <br />129.20 <br />ENGINEER IV <br />119.58 <br />170.97 <br />ENVIRONMENTAL SCIENTIST II <br />68.30 <br />88.00 <br />ENGINEER III <br />100.31 <br />153.73 <br />ENVIRONMENTAL SCIENTIST 1 <br />59.03 <br />80.82 <br />ENGINEER II <br />91.34 <br />122.51 <br />ARCHITECT VI <br />141.49 <br />189.76 <br />ENGINEER 1 <br />86.81 <br />118.28 <br />ARCHITECT V <br />125.72 <br />162.70 <br />ELECTRICAL ENGINEER VI <br />173.81 <br />214.70 <br />ARCHITECT IV <br />109.95 <br />138.65 <br />ELECTRICAL ENGINEER V <br />137.03 <br />172.94 <br />ARCHITECT III <br />107.28 <br />138.84 <br />ELECTRICAL ENGINEER IV <br />119.46 <br />154.60 <br />ARCHITECT II <br />84.67 <br />109.57 <br />ELECTRICAL ENGINEER III <br />105.20 <br />136.14 <br />ARCHITECT 1 <br />71.36 <br />92.35 <br />ELECTRICAL ENGINEER 11 <br />102.20 <br />132.26 <br />LANDSCAPE ARCHITECT V <br />123.10 <br />159.31 <br />ELECTRICAL ENGINEER 1 <br />91.15 <br />117.96 <br />LANDSCAPE ARCHITECT INTERN II <br />78.67 <br />101.81 <br />MECHANICAL ENGINEER VI <br />165.64 <br />214.35 <br />LANDSCAPE ARCHITECT INTERN 1 <br />76.38 <br />98.84 <br />MECHANICAL ENGINEER V <br />147.86 <br />191.35 <br />PLANNER VII <br />194.00 <br />251.06 <br />MECHANICAL ENGINEER IV <br />130.08 <br />168.21 <br />PLANNER VI <br />154.98 <br />220.15 <br />MECHANICAL ENGINEER III <br />103.32 <br />133.70 <br />PLANNER V <br />128.04 <br />165.70 <br />MECHANICAL ENGINEER II <br />94.08 <br />121.75 <br />PLANNER IV <br />101.10 <br />130.84 <br />MECHANICAL ENGINEER 1 <br />86.78 <br />112.31 <br />PLANNER III <br />84.30 <br />106.33 <br />PROGRAM MANAGER II <br />171.25 <br />221.09 <br />PLANNER 11 <br />74.48 <br />96.39 <br />PROGRAM MANAGER 1 <br />119.60 <br />157.29 <br />PLANNER 1 <br />71.05 <br />91.95 <br />CONSTRUCTION CONTRACT ADMIN 111 <br />117.00 <br />193.31 <br />HYDROLOGIST VI <br />146.18 <br />189.17 <br />CONSTRUCTION CONTRACT ADMIN II <br />100.87 <br />163.60 <br />HYDROLOGIST V <br />126.41 <br />163.59 <br />CONSTRUCTION CONTRACT ADMIN 1 <br />73.55 <br />120.05 <br />HYDROLOGIST IV <br />106.64 <br />138.39 <br />CONSTRUCTION DOCUMENT COORDINATOF <br />83.69 <br />108.31 <br />HYDROLOGIST III <br />92.29 <br />119.43 <br />DOCUMENT CONTROL CLERK <br />60.12 <br />106.67 <br />HYDROLOGIST 11 <br />83.06 <br />107.49 <br />SR DESIGNER <br />150.41 <br />191.15 <br />SENIOR GEOLOGIST <br />111.57 <br />144.38 <br />DESIGNER 11 <br />124.53 <br />165.56 <br />GEOTECHNICAL ENGINEER VI <br />181.00 <br />234.23 <br />DESIGNER 1 <br />109.12 <br />141.21 <br />RIGHT OF WAY AGENT <br />86.05 <br />111.36 <br />SR CADD DESIGNER <br />121.91 <br />157.77 <br />PUBLIC INVOLVEMENT COORDINATOR <br />79.71 <br />123.19 <br />CADD DESIGNER <br />117.35 <br />162.92 <br />WORD PROCESSING /SECRETARIAL <br />52.92 <br />86.52 <br />TECHNICIAN IV <br />91.86 <br />123.61 <br />OPERATIONS ANALYST <br />112.00 <br />155.06 <br />TECHNICIAN III <br />76.61 <br />110.34 <br />CONTRACT ADMINISTRATOR <br />68.93 <br />86.68 <br />TECHNICIAN II <br />61.92 <br />93.29 <br />PROJECT CONTROL SPECIALIST <br />65.64 <br />84.94 <br />TECHNICIAN 1 <br />56.50 <br />73.12 <br />INFORMATION SERVICES SUPERVISOR <br />67.60 <br />87.48 <br />GIS ANALYST V <br />107.39 <br />137.33 <br />INFORMATION SERVICES CLERK III <br />49.76 <br />64.39 <br />GIS ANALYST IV <br />103.00 <br />136.08 <br />INFORMATION SERVICES CLERK II <br />38.56 <br />49.90 <br />GIS ANALYST III <br />79.35 <br />110.07 <br />INFORMATION SERVICES CLERK 1 <br />38.52 <br />44.34 <br />GIS ANALYST 11 <br />64.08 <br />81.69 <br />CO -OP <br />39.60 <br />89.96 <br />GIS ANALYST I <br />52.02 <br />67.32 <br />The ranges and individual salaries will be adjusted <br />annually. <br />RATES FOR INHOUSE SERVICES <br />Computer and CAD <br />Calcomp Plotter <br />Print Shop <br />PC CAD Stations $10.00 per hr. <br />Bond <br />$2.50 per plot <br />Color Copies & Printing <br />$0.50 per single side <br />copy <br />Other <br />$5.00 per plot <br />$1.00 per double side copy <br />Color <br />$5.75 per plot <br />Black & White Copies & Printing <br />$0.10 per single side <br />copy <br />Testing Apparatus <br />$0.20 per double side copy <br />Density Meter $700.00 per month <br />Gas Detection $20.00 per test <br />Binding <br />$5.75 per book <br />OTHER DIRECT EXPENSES: <br />Other direct expenses are reimbursed at actual cost times <br />a multiplier of 1.10. They include outside printing and reproduction expense, <br />communication expense, travel, <br />transportation and subsistence away from the FNI office <br />and other <br />miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and <br />other work required to be done by independent persons other than staff members. <br />For Resident Representative services performed by non -FNI employees and CAD <br />services performed In -house by non -FNI employees where FNI provides workspace <br />and equipment to perform such services, these services will be billed at cost times a <br />multiplier of 2.0. This markup approximates the cost to FNI if an FNI <br />employee was performing the same or similar services. <br />ggp :04 -1 -1136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.