Laserfiche WebLink
<br />TASK 1 - PROJECT MANAGEMENT <br />TASK 2 - ASSEMBLE, REVIEW AND EVALUATE EXISTING DATA <br />TASK 3 - PRELIMINARY DESIGN REPORT <br />TASK 4 - CONSTRUCTION DOCUMENTS/ <br />TECHNICAL SPECIFICATIONS <br />TASK 5 - ENVIRONMENTAL PERMITTING <br />TASK 6 - BIDDING AND CONSTRUCTION ADMINISTRATION <br />TOTAL FEE: <br /> <br />$ 327,090.43 <br />$ 57,804.52 <br />$ 703,138.31 <br /> <br />I <br /> <br />$1,919,134.32 <br />$ 27,113.91 <br />$2.373.461.76 <br />$5,407,743.25 <br /> <br />15.3 Compensation for Basic Services and for Additional Services of the Engineer will be <br />computed based on the Engineer's standard hourly rates: <br /> <br />KIl <br /> <br />B <br /> <br />& R tL b R t <br /> <br />e o~~ rown 00 a or a es <br />Title Rate ($/hr) <br />Proj ect Manager $171.53 <br />Project Engineer $157.00 <br />Structural Engineer $156.06 <br />Senior Engineer $133.94 <br />Engineer $107.01 <br /> EIT $ 88.69 <br />Tech-CADD $ 80.72 <br />Senior Environmentalist $153.36 <br />Junior Environmentalist $ 75.34 <br />Inspector (Roadway) $106.55 <br />Inspector (Bridge) $106.55 <br /> GIS $121.08 <br />Clerical $ 53.81 <br /> <br />Blanton & Associates Labor Rates <br /> <br />Title Rate ($/hr) <br />Project Director $141.00 <br />Senior Project Manager $115.00 <br />Project Manager $105.00 <br />Env. Specialist II $ 87.00 <br />Env. Specialist I $ 85.00 <br />Env. Tech II $ 64.00 <br />Env. Tech I $ 55.00 <br />GIS Manager $104.00 <br />GIS Tech $ 85.00 <br />Admin $ 60.00 <br /> <br />28 <br /> <br />I <br /> <br />I <br />