My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-141
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2007 2:34:00 PM
Creation date
10/19/2006 4:19:18 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
2006-141
Date
9/5/2006
Volume Book
169
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..~~. <br />.....-...: - <br /> <br />. ENERGY. WATER. COMMUNITY SERVICES <br /> <br />TRANSMISSION <br />SERVICES CONTRACT <br /> <br />CUSTOMER: The City of San Marcos <br /> <br />630 East Hopkins <br />San Marcos, Texas 78666 <br /> <br />DATE SUBMITTED: <br /> <br />July 6, 2006 <br /> <br />ADDITIONAL SCOPE OF SERVICES: <br /> <br />JOB NUMBER: <br /> <br />1007309 <br /> <br />In additIOn to engineering service the Lower Colorado River Authority shall provide to the City of San Marcos services <br />for construction and material required to upgrade the Redwood Station. The project includes services for the <br />following: 1. Modifying the existing feeder bays and adding a new feeder bay with associated relay and controls, 2. <br />Replacing CS8235 with a 40 kA circuit switcher, 3. The addition of one 138 kV switch for the circuit switcher, 4. The <br />addition of a set of CT's on T-2, 5. The removal of SS-2 from T-2, 6. Construction of the revised Transformer <br />Differential panel, 7. Interface the circuit switcher change out to the new Supervisory Interface Panel, 8. Develop <br />protective relay settings. <br /> <br />SCHEDULE: <br />A schedule will be developed in agreement with both parties, upon receipt of this approved contract. <br /> <br />ADDITION TO CONTRACT PRICE: <br /> <br />Billing will be on a cost plus basis invoiced monthly. <br /> <br />Estimated Added Cost: <br /> <br />$281,500 <br />$298,500 <br /> <br />Notto Exceed: <br /> <br />Customer and the Lower Colorado River Authority agree that the work described above shall be performed in accordance with the <br />terms and conditions on the front and reverse sides of this form. <br /> <br />The City of San Marcos <br /> <br /> <br />Lower Colorado River Authority <br /> <br />By: <br /> <br />By: <br /> <br />--) }/( cr..~~'J ) / rn-c <br />Mary M6'ore, Sf. Project Manager <br /> <br />Title: <br /> <br />Dan <br /> <br />Manager <br /> <br />Title: <br /> <br />Date: <br /> <br />September 6. 2006 <br /> <br />Date: <br /> <br />7-& dO()&- <br /> <br />OFFICE USE ONLY <br /> <br />Accounting: <br /> <br />30005/LNA/1 007309 <br /> <br />Approved By: <br />Completion Date: <br /> <br />POBOX 220 . AUSTIN, TEXAS. 78767-0220 . (5121473.3200 . 1-800-776.5272 . WWW LCRAORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.