Laserfiche WebLink
<br />To the City: <br />City Manager <br />City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br />Fax: 512-396-4656 <br /> <br />To the Engineer: <br />James E. Bym, President <br />Byrn and Associates, Inc. <br />P.O. Box 1433 <br />San Marcos, Texas 78666 <br />Fax: 512-392-2945 <br /> <br />ARTICLE 15 <br />BASIS OF COMPENSATION <br /> <br />15.1 The City will compensate the Engineer, in accordance with Article 5, Payments to the <br />Engineer, and the other terms and conditions of this Agreement, as follows: <br /> <br />15.2 The total of all fees and expenses to be paid to Engineer as described in Sections 1.1 <br />through 1.5 will not exceed $97,885.00. <br /> <br />15.3 Compensation for Basic Services and for Additional Services of the Engineer shall be <br />computed based on the Engineer's standard hourly rates: <br /> <br />Principals: <br />James E. Bym, P .E. <br />David C. Williamson, R.P.L.S <br />Office Personnel: <br />Registered Engineer <br />Graduate Engineer <br />Registered Surveyor <br />Technician I <br />Technician II <br />Technician III <br />Clerical <br />Field Survey Party: <br />Field Crew and Equipment (2 man) <br />Additional Personnel for Crew <br />Field Crew and Equipment (1 man) <br />Reimbursables (when applicable): <br />Stakes <br />Mileage <br />Prints <br />Supplies <br />Miscellaneous <br />GPS Survey Equipment <br />Computer and Computer Graphics <br />Meals and Lodging <br /> <br />$150.00 <br />$110.00 <br /> <br />$135.00 <br />$100.00 <br />$100.00 <br />$ 80.00 <br />$ 70.00 <br />$ 65.00 <br />$ 50.00 <br /> <br />$120.00 <br />$ 30.00/ea <br />$ 90.00 <br /> <br />$0.50/ea <br />$0.50 per mile <br />Cost <br />Cost + 15% <br />Cost + 15% <br />$100.00/hr. <br />$ 50.00 <br />Cost + 15% <br /> <br />Each of the persons executing this Agreement represents that he or she has full power and <br /> <br />14 <br /> <br />McCarty Lane 16" Agreement <br />