My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-076
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 1:21:46 PM
Creation date
7/25/2012 2:15:28 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE! 2011 -09 -09 <br />ESTIIATS OF MATERIAL Ii NO FORCE ACOUNT WORK <br />SY TH'E <br />UNION PACIFIC RAILROAD <br />'•H4 E6T2l m GOOb FOR 6 Y.mWhs EXPIRATruir DAT$ IS :1012 -03 -09 <br />DESCRIPTION OF WRK, <br />IiISTALL •AIfVANCED- PREEMPTION -TO EXISTING CROSS'iNG '.AT: • • • •- <br />tfJMWD AUAD - SAN 6UARCOS, TX - t4. P. 201.90 bN TRa <br />AUSTM SUBDIVISION DOTS 447676Y <br />%$PAX TO BR 9ERFORKTO, BY RAXJAOAD WITH EXPENSE A$ 13SLONi <br />SIGNAL - CITY - 100ir, <br />EBTIl4ATSD USIIiO FSOEAAL ADDITIVE$ WITH OVERkSAD L INDIRECT <br />CONSTRUCTION COSTS - SIGNAL - 167.761k <br />PIDt 73718 AJCOs 09873 MP,BUBDIVt 207.90, AUSTTIi <br />SERVICE UNITt 12 'Cl-M SID STATEi TX <br />DESCRIPTION OTY UtlIT MW R i4ATERFAL RECALL QpRR TOTAL <br />--- ----- - -- --- ---- ----- - - ------ -- - -- -- -- -- <br />RuG:TNEERINV YiORK <br />Et ItlEER]1QG <br />i 69j <br />6693 <br />6693 <br />LABOR• ADDITIVE 167.70 <br />19315 <br />19315 <br />-19315 <br />SIG -11W XRG <br />4821 <br />46$3 <br />3021 <br />TOM kbidlNERRIN4 <br />----- <br />76829 <br />-- -- ---- <br />- -- --- --- - - <br />30829 <br />- -- -------- <br />30849 <br />'SIONArA h'ORK <br />BILL PREP <br />9u¢ <br />900 <br />900 <br />CONTRACT <br />7546 <br />7546 <br />7546 <br />LABOR ADDITIVE 167.761r <br />43739 <br />48139 <br />48739 <br />MATL $TQ$E EXPENSE <br />5 <br />B <br />5 <br />RER$O.YAL EXPENSES <br />16.417 <br />16417 <br />16417 <br />SIGNAL <br />29053 <br />75466 <br />104519 <br />104519 <br />TAWSPAB /OD /}X1.59 CONTR <br />9353 <br />93$3 <br />9353 <br />TOTAL SIGNAL <br />------- -------- <br />78692 <br />- <br />X08787 <br />--- ---- -------- <br />187479 <br />-------- <br />167479 <br />TRACK & AURFACE V*RX <br />ENVIROMMUTAL - PERFJITS <br />1 <br />1 <br />1 <br />TOTAL TRACK 1G SURFACE <br />1 <br />1 <br />1 <br />LADOR/MTERIAL EXPENSE 109521 108788 -- - - - - -- -- -• - - -- <br />R9COLLECTISLB /UPRR EXP9HSE 218309 0 -- - - - - -- <br />XSTI14ATED PROJECT COST 218309 <br />TN$ ABOVE FIGURES AR8 ESTIMATES ONLY Afm SUd4EC4` TO FLUCTUATION. IN THE EVSNT'OP <br />AN INCREASE OR DECREASE IN THE COST OR QUAl3PITY OF MTERIAL OR LABOR REQUIRED, <br />UPRR 11I.LL BILL FOR ACTUAL CONSTRUCTION COSTS-AT THE CURRENT EFFECYIVR RATE. <br />BI <br />
The URL can be used to link to this page
Your browser does not support the video tag.