My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-077
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2012 3:05:54 PM
Creation date
7/25/2012 2:41:24 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 13 <br />BASIS OF COMPENSATION <br />13.1 The City will compensate the Engineer, in accordance with Article 5, Payments to the <br />Engineer, and the other terms and conditions of this Agreement, as follows: <br />13.2 The total of all fees and expenses to be paid to the Engineer for Basic Services as <br />described in Sections 1.1 through 1.9 will not exceed $176,110.00 and includes labor and <br />expenses. This compensation is divided among the Basic Services below: <br />1.1 <br />TASK 1— <br />PROJECT MANAGEMENT <br />$ <br />25,410.00 <br />1.2 <br />TASK 2 <br />— DELINEATION OF SERVICE AREA AND <br />$ <br />15,760.00 <br />ASSESSMENT OF NEED <br />1.3 <br />TASK 3 — DEMAND DEVELOPMENT <br />$ <br />16,760.00 <br />1.4 <br />TASK 4 <br />— CONCEPTUAL PLANNING AND DESIGN <br />$ <br />33,640.00 <br />1.5 <br />TASK 5 <br />ALTERNATIVE COST EVALUATION <br />$ <br />8,840.00 <br />1.6 <br />TASK 6 <br />ECONOMIC ANALYSIS <br />$ <br />26,920.00 <br />1.7 <br />TASK 7 <br />ENVIRONMENTAL CONSIDERATIONS <br />$ <br />12,020.00 <br />1.8 <br />TASK 8 <br />IMPLEMENTATION STRATEGY <br />$ <br />14,640.00 <br />1.9 <br />TASK 9 <br />DRAFT AND FINAL REPORT <br />$ <br />22,120.00 <br />TOTAL FEE: <br />$176,110.00 <br />13.3 Compensation for Additional Services of the Engineer will be computed based on the <br />Engineer's standard hourly rates and reimbursable expenses, as applicable: <br />Principal <br />Sr. Project Manager <br />Project Manager <br />Engineer /Scientist/Planner <br />Engineering Staff <br />Sr. Technician /Drafter <br />Technician/Drafter <br />Administrative Support <br />$220.00 - $255.00 <br />$170.00 - $220.00 <br />$120.00 - $170.00 <br />$100.00 - $140.00 <br />$ 80.00 - $120.00 <br />$ 90.00 - $115.00 <br />$ 60.00 - $ 80.00 <br />$ 55.00 - $ 75.00 <br />Travel and Subsistence — All travel and subsistence will be invoiced at actual cost plus ten (10) <br />percent. Cost of mileage for private and company vehicles is computed at the prevailing rate <br />designated by the U.S. Internal Revenue Service. The current rate is $0.555 per mile. <br />Purchased Services — All purchased services are invoiced at actual cost plus ten (10) percent. <br />These include but are not limited to reproduction, rented or leased equipment, etc. <br />Subconsultant Services — All subconsultant services (geotechnical, survey, landscape, <br />architecture, etc.) are invoiced at cost plus ten (10) percent. <br />Direct Water Reuse Feasibility Study 2012 — Espey <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.