Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />FORM 7e: Detailed Equipment Expenses <br /> <br />All eqUipment purchases must be pre-approved by CAPCOG. If the specific details of an <br />equipment purchase are known, show that equipment on the list below. If the specific details of <br />the equipment costs are not known at this time, list the general details on this form. The specific <br />detaIls of the equipment will then need to be provided to and approved by CAPCOG before the <br />costs are incurred. <br /> <br />Equipment ($5,000 or more per unit) No.of <br />(Show description, type, model, etc.) Unit Cost Units Total Cost <br />12'x 24' Portable storage building to include $ 6,000.00 1 $ 6,000.00 <br />freight and installation <br /> $ $ <br /> $ $ <br /> $ $ <br />TOTAL $ 6,000.00 <br />(Must equal Line 5 of the Overall Budget Summary) <br /> <br />Project Application <br />Form 7e <br /> <br />Page of <br />