My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2006-183
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2006
>
Res 2006-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2008 10:53:49 AM
Creation date
11/17/2006 9:25:31 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2006-183
Date
11/6/2006
Volume Book
170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />" <br /> <br />ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK BY THE <br />UNION PACIFIC RAILROAD COMPANY <br />FOR THE STATE OF TEXAS <br /> <br />DESCRIPTION OF WORK: City to build overpass, UPRR to provide 30 days flagging/Engineering Review <br /> <br />LOCATION: Yarrington Road <br />MP 204.0 <br /> <br />SERVICE UNIT: 12 <br />Austin Sub <br />LABOR <br /> <br />STATE:TX <br /> <br />DATE: 10/10/2006 <br /> <br />DESCRIPTION <br />JOB 001 - ENGINEERING <br />ENGINEERING LABOR <br />LABOR ADDITIVES (173.30%) <br /> <br />MATERIAL <br /> <br />TOTAL <br /> <br />$5,000 <br />$6,900 <br /> <br />o <br /> <br />JOB 002 - FLAGGING <br />FLAGGING <br />LABOR ADDITIVES (173.30%) <br /> <br />$21,000 <br />$28,333 <br /> <br />o <br /> <br />TOTAL PROJECT: <br /> <br />$61,233 <br /> <br />o <br /> <br />$61,233 <br /> <br />EXISTING REUSABLE MATERIAL - NONE <br />30 days flagging <br />EXISTING NONREUSABLE MATERIAL - NONE <br /> <br />TOTAL ESTIMATED COST OF PROJECT LESS CREDITS: <br /> <br />$61,233 <br /> <br />THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. <br />IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF <br />MATERIAL OR LABOR REQUIRED, THE RAILROAD WILL BILL FOR ACTUAL <br />CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. <br /> <br />Exhibit C <br />Engineering Plan Review & Flagging Estimate <br />To Public Road Crossing Developers Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.