Laserfiche WebLink
nw aaanaacxx+ <br />Site Fees <br />Adopted August 7, 2012 <br />Watershed Protection <br />Watershed Protection Plan Phase 1 $450 <br />Watershed Protection Phase 11 only $600 + $50 / acre ($3,000 max) <br />Subdivision Improvements including more than 1 type of Infrastructure <br />$2,000 + $50/ acre (includes the entire limits <br />of construction) <br />Individual Transportation or utility infrastructure Extensions <br />$1000 + $5/ linear ft of each improvement <br />Complete Site Preparation requires engineer) <br />$1,500 + $50/ acre <br />Small Site Preparation <br />$250 <br />San Marcos River Coridor Site Plan <br />$250 <br />Permit to install on -site sewage disposal system <br />$175 <br />TIA <br />$315 <br />TIA Worksheet <br />$100 <br />Driveway /Sidewalk Permit <br />Residential (Type I Driveway or Sidewalk <br />$25 <br />Commercial (Type II Driveway or Sidewalk <br />$50 <br />ROW Maintenance/ Improvement Permit <br />5% of project value ($50 min / $2000 max) <br />On- premise signs up to 100 square feet <br />$1 /sgft $50 min. <br />Off - premise signs / billboards <br />$250 <br />Fence permit Fee <br />$50 <br />Resubmittal Fee for 3rd Submittal (All Permit Types) <br />$250 ea resubmittal <br />All multipliers should be rounded to the nearest whole number 12 <br />