My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-031
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2007 5:21:35 PM
Creation date
2/8/2007 1:39:00 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-31
Date
2/6/2007
Volume Book
170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,c' , <br /> <br />CSJ #0016-03 <br />District #14 - Austin <br />Code Chart 64 #37950 <br />1-35 SB FTG Rd - at McCarty Lane <br /> <br />Attachment A <br /> <br />Payment Provisions and Work Responsibilities <br /> <br />The Local Government will pay for the cost of the construction to reconfigure the ramps. The Local <br />Government's participation is 100% of the cost of this particular improvement. The Local <br />Government's estimated cost of this additional work is $1,637,616, including construction items, <br />construction engineering and contingencies, administration costs and indirect costs. The State has <br />estimated the project to be as follows: <br /> <br />Description <br /> <br />Total <br />Estimate <br />Cost <br /> <br />Federal <br />Participation <br /> <br />State <br />Participation <br /> <br />Local <br />Participation <br /> <br /> <br />Construction of Ramp $1,351,000 0% $0 0% $0 100% $1,351,000 <br />Reconfi uration <br />Construction Engineering $175,630 100% $175,630 <br />and Ins ection 13% <br />Subtotal $1,526,630 $0 $1,526,620 <br />Direct State Costs $45,799 0% $0 0% $0 100% $45,799 <br />(including plan review) 3% <br />Indirect State Costs (no $65,187 0% $0.00 0% $0.00 100% $65,187 <br />local participation required <br />except for service <br />ro'ects 4.27% <br />TOTAL $1,637,616 $0 $0 $1,637,616 <br /> <br />Direct State Cost will be based on actual charges. <br /> <br />Local Government's Participation (100%) = $1,637.616 <br /> <br />This is an estimate only; final participation amounts will be based on actual charges to the project. <br /> <br />Work Responsibilities <br /> <br />1. Environmental Requirements <br /> <br />A. The Local Government shall be responsible for identification of all environmental <br />issues associated with this project and shall be responsible for preparation of the <br />appropriate environmental documentation necessary to secure environmental <br />clearance for the Project. Preparation and coordination of the environmental <br />documentation shall be through the TxDOT Austin District Environmental <br />Coordinator at (512) 832-7168. <br /> <br />AFA-LPAFA_ VolProj <br /> <br />Page 5 of 7 <br /> <br />Revised 2/3/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.