My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2007-041
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2007
>
Res 2007-041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2007 3:01:56 PM
Creation date
3/23/2007 10:02:31 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2007-41
Date
3/6/2007
Volume Book
171
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The City agrees that it will sample the Reclaimed Water as may be required by Title 30, Part 1, I <br />Section 210.34 of the Texas Adrninistrative Code or other applicable regulation; and shall provide <br />the results of such sample to TXI, by email or facsirnile. In the event the City learns of sample <br />results which may pose a hazard to health or wellbeing ofTXI workers or equipment beyond those <br />known to exist with Type I reclairned water, the City will notify TXI of such results imrnediately. <br /> <br />Section 1.03. Metering Equipment. The City will obtain and install magnetic metering equipment <br />and devices which meet the City's standard specifications for rneasuring within a tolerance of 2% <br />(the "Accuracy Tolerance") the quantity of Reclaimed Water. The metering equiprnent will be <br />installed at TXI's property line, which is defined as the "Point of Delivery." The metering <br />equiprnent shall also include devices and equiprnent of standard type for the proposed application to <br />limit, measure, and record the rate of flow at the Point of Delivery, to prevent the back flow of water <br />or the contamination of water in the City's distribution system, and to protect and secure the rnetering <br />equipment and other devices <br /> <br />Section 1.04. Maintenance and Testing of Metering Equipment. <br /> <br />A. The City will maintain the metering equipment within the Accuracy Tolerance, and will <br />test the metering equipment for accuracy at least once every 12 months. <br /> <br />B. TXI may have the metering equipment independently tested at its own cost with 48 hours <br />notice to the City. The City may attend any such test. If a test shows an inaccuracy in the rnetering I <br />equiprnent, the City will adjust the monthly billing of a period extending back to the tirne when the <br />inaccuracy began if such tirne is ascertainable, or if such tirne is not ascertainable, for a period <br />extending back to the last test of the rnetering equiprnent or 120 days, whichever is shorter, in <br />accordance with the percentage of inaccuracy found during the test, whether above or below the <br />correct volume. In the event the meter fails to register for any period, the City will calculate the <br />usage during the time of meter failure to be the amount of Reclaimed Water furnished during the <br />same period ofthe previous year, or as otherwise mutually agreed upon by the parties. The City will <br />recalibrate or replace any inaccurate rnetering equipment at its expense. <br /> <br />Section 1.05. Billing. The City will furnish TXI with an itemized monthly billing statement <br />showing the volurne ofReclairned Water supplied in 1,000 gallon increments and the amounts due. <br /> <br />Article 2. Deliverv Facilities <br /> <br />Section 2.01. Construction of Delivery Facilities. The City will be responsible for securing <br />engineering services, acquiring needed rights-of-way and easements, and securing construction <br />services for the Delivery Facilities for the transmission ofReclairned Water from the City's existing <br />I8-inch reclaimed water pipeline to the Point of Delivery. The City will have plans and <br />specifications for the Delivery Facilities prepared by a professional engineer registered in Texas, and <br />the City will submit these plans and specifications for review and approval by the Texas Commission I <br />on Environmental Quality ("TCEQ"). The Delivery Facilities will include metering equipment <br />provided by the City. TXI will be responsible for the design, construction and maintenance of <br />facilities on its property. It is anticipated that these improvements will include approximately 4,000 <br /> <br />2 <br /> <br />~ 3/,1.1/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.