Laserfiche WebLink
<br />I <br /> <br />Concrete and Aeereeates <br /> <br />Concrete Compression Test (including hold cylinders), each .........................................$ <br />Concrete Flexural Test (including hold beams), each .....................................................$ <br /> <br />Soils <br /> <br />Moisture/Density relationship of soils (Standard or Modified Proctor), each.................$ <br />Atterberg Limits Determination (PI), each................. ............... .................. ............. .......$ <br />Sieve Analysis ASTM C 136, each.......................................... ...................... ...................$ <br />Percent Passing #200 sieve, each........................................ ......................... ....................$ <br /> <br />Asphaltic Concrete Testine <br /> <br />Extraction and Gradation, each.................. ..................... ................. ................................$ <br />Molding Specimens, per set of 3.................................... ......................................... .........$ <br />Density of Specimens, per set 3............... ..................... ........... .................... .......... ..........$ <br />Stability, per set of 3 ... .................. ................ ............... ........... ...... ......................... ..........$ <br />Density and Thickness of Asphalt Cores, each................................................................$ <br />Theoretical Specific Gravity......................................................................................... ...$ <br />Set of tests (Extraction-Gradation, Density and Stability, and Theoretical Specific <br /> <br />Gravity) ..................................... ...... ..... ......... ............. .... ........................................... .......$ <br /> <br /> <br />I Steel <br /> <br />Yield Testing of Existing Coupons, each ........................................................................$ <br />Cutting of Coupons for Yield Test, each......................... ........................................ ........$ <br /> <br />Field Testine Services <br /> <br />10.00 <br />20.00 <br /> <br />150.00 <br />50.00 <br />55.00 <br />45.00 <br /> <br />150.00 <br />70.00 <br />55.00 <br />75.00 <br />35.00 <br />70.00 <br /> <br />380.00 <br /> <br />45.00 <br />75.00 <br /> <br />Engineering technician to perform: <br />a. Field concrete inspection <br />b. Field asphalt inspection <br />c. Field sampling and sample pick-up <br />d. Masonry Inspection <br />Engineering technician, Per hour ............................................. ................... ................ .....$ 32.00 <br />Nuclear Density Gauge, Per Day....... ............. ................ .......... ............. ................... ......$ 30.00 <br /> <br />Field Testine Services (cont.) <br /> <br />I <br /> <br />Coring rig, Per day........ ...... ......... ......... ........ .......... ........ .......... ............. ........ .......... ........$ <br /> <br />Bit recovery, Per inch ....... .................................... ......... ... ............ ......................... ........ ..$ <br /> <br />Senior engineering technician to perform: <br />a. Pier or Footing Inspection <br />b. Concrete or asphalt batch plant inspection <br /> <br />PSI Conference Center Testing.doc <br /> <br />15 <br /> <br />75.00 <br />5.00 <br />