Laserfiche WebLink
<br /> SECTION II. RELEASE INCIDENT SUMMARY (continued) <br /> YES I NO For YES or NO answers. please drde response in the left hand column. <br /> ~/NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wells installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> d. Depth of monitor wells installed: N/A <br /> YESJ NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 ",stems) <br /> b. Date system installed: 04/92 <br /> c. System start up date: O!;/92 <br /> YESINO 17. Have any technical reports been for this site? <br /> XES I NO 18. Has a technical report been prepared and submitted to the 'INRCC for the phase of work completed for the <br /> billing period of this application? If yes. complete Section ill. Technical ReDOrt SUmmary. <br /> 19. Provide a brief summary of the activities that have been peñonned to date and for activities for which <br /> reimbursement is sought in this application: <br /> Samplinr and anaIyriC'.al services have been on~oinr. with administrative sqpport ntili7.ed and f:Q..wment <br /> purchases ktWt to minimum while ensurinr ~ lte monitorin, <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES 1.&1 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> YES 1.&1 21. Will new tanks be installed at this site? If yes. indicate proposed date: <br /> <br /> YES 1m 22. Were the activities and costs being submitted in this claim preapproved by the TNRCC? If yes, by whom: <br /> TNRCC APPUCATION FOR REIMBURSEMENT E-Z FORM 9 <br /> 1NRCC-O230-EZ (Revised09-O1-95) <br /> - <br />