Laserfiche WebLink
<br /> SECTION II. RELEASE INCIDENT SUMMARY (continued) <br /> YES/NO For YES or NO answers. please circle response in the left hand column. <br /> 1:ES/NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wens installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> d. Depth of monitor wells installed: N/A <br /> ~NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 ~s) <br /> b. Date system installed: 04/92 <br /> c. System start up date: n; /92 <br /> YES 1 NO 17. Have anv technical reoorts been Dreoared for this site? <br /> ~/NO 18. Has a technical report been prepared and submitted to the lNRCC for the phase of work completed for the <br /> billius! oeriod of this am>lication? If ves, complete Section ill, Technical Reoort Summarv. <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sougbt in this application: <br /> Sanw)jn~ and ana1ytical services have been o~oinr. with administrative SQpport utilized and eQJlipment <br /> purchases kq>t to minimum while ensurinr adeQJlate monitorinr <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES 1 NO 20. Have new tanks or lines been instllied at this site? If yes, indicate date(s) of installation: <br /> YES 1 &l 21. Will new tanks be installed at this site? If yes, indicate proposed date: <br /> <br /> YES l.&l 22. Were the activities and costs being submitted in this claim preapproved by the lNRCC? If yes, by whom: <br /> 1'NRCC APPUCATION FOR REIMBURSEMENT E-Z FORM 9 <br /> 1'NRCC-0230-J:Z (Revised 09-01-95) <br />