Laserfiche WebLink
<br /> I <br /> SECTION ß. RELEASE INCIDENT SUMMARY (continued) <br /> I <br /> I YES / NO For YES or NO answers. please circle resnonse in the left hand column. <br /> .xES/NO 15. Have monitor wells been installed at this site? If yes: <br /> I. a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wells installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> 8. d. Deoth of monitor wells installed: N/A <br /> DS./NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 $YsterM) <br /> I. b. Date system installed: 04/92 <br /> c. Svstem start up date: O.li: / Q'l <br /> I YES / NO 17. Have any technical reports been orenared for this site? <br /> :xES/NO 18. Has a technical report been prepared and submitted to the lNRCC for the phase of wod: completed for the <br /> I billinl!: oeriod of this aDPlication? If ves, comolete Section ID, Technical Report Summarv. <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for wbicb <br /> reimbursement is sought in this application: <br /> I, <br /> ~li~ and anaIyrir.,d ~œK have been on~ine. with administrative sqpport utilized and equtpmmt <br /> I porehases ~t to minimum while eosurine IVtpql1ate monitorine <br /> <br /> <br /> I <br /> <br /> <br /> I <br /> <br /> <br /> 1 <br /> <br /> <br /> I <br /> YES / ml 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> I <br /> YES / ml 21. Will new tanks be installed at this site? If yes, indicate proposed date: <br /> <br /> ,; <br /> YES /.lID 22. Were the activities and costs being submitted in this claim preapproved by the lNRCC? If yes, by whom: <br /> I <br /> I <br /> I 1NRCC APPUCA TION FOR REIMBURSEMENT E-Z FORM 9 <br /> 1NRCC-0230-EZ (Revised 09-01-95) <br />