My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-124
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2007 4:59:10 PM
Creation date
4/16/2007 4:01:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-124
Date
6/22/1998
Volume Book
133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ARTICLE 11 <br /> EXTENT OF AGREEMENT <br />11,1 This Agreement represents the entire and integrated Agreement between the City <br />and the Engineer and supersedes all prior negotiations, representations or agreements <br />either written or oral. Except as to a change in the scope of services, the compensation <br />for which does not exceed $15,000, this Agreement may be amended only by separate <br />written instrument approved by the City's governing body and signed by both the City and <br />Engineer. <br />11.2 Any exhibits and/or attachments attached to this Agreement are incorporated by <br />reference into this Agreement as though included verbatim herein. <br />11.3 In the even of any conflict between the Agreement and the provisions of any exhibit <br />or attachment to this Agreement, this Agreement will govern and control. <br /> ARTICLE 12 <br /> BASIS OF COMPENSATION <br />12.1 The City will compensate the Engineer, in accordance with Article4, Payments to <br />the Engineer, and the other terms and conditions of this Agreement, as follows: <br />12.2 The total fee to be paid to Engineer for Basic Services as described in Attachment <br />A, Scope of Services will be $36,360.00 The Engineer's expenses for travel, office, <br />production and other expenses associated directly or indirectly with this Agreement are <br />included as part of the total fee. This compensation is divided among the Basic Services <br />tasks as follows: <br />TASK 1 - Assemble Pertinent Data $ 3,040,00 <br />TASK 2 - Preliminary Design Evaluation $ 6,905.00 <br />TASK 3 - Alternate Routing Evaluation $ 2,300,00 <br />TASK 4 - Meter Location Coordination $ 920,00 <br />TASK 5 - Utility Billing Tracking Recommendation $ 4,839,00 <br />TASK 6 - Final System Water Modeling $ 7,953,00 <br />TASK 7 - Attend City Meetings $ 3,200.00 <br />TASK 8 - Attend SWTSU Coordination Meetings $ 1,280,00 <br />TASK 9 - Draft Report $ 3,790,00 <br />TASK 10-Final Report $ 1.230.00 <br /> <br />TOTAL FEE: $36,360.00 <br />12,3 Compensation for additional services of the Engineer, as described in Section 4.2, <br />shall be computed based on the Engineer's standard hourly rates as specified in <br />Attachment B, Manpower Requirement and Fees for Basic Service Tasks. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.