Laserfiche WebLink
<br /> this data and information. <br /> 1.2 TASK 1 - PRELIMINARY DESIGN <br /> The Engineer will: <br /> Preliminary Engineering <br /> <br /> 1.2.1 Gather available information on the water and wastewater line alignments including, <br /> but not limited to the following: <br /> (a) existing utility system maps (water, wastewater, telephone, gas, <br /> electric, cable), <br /> (b) existing digital topography, <br /> (c) existing City and the Texas Department of Transportation (UTxDOT" <br /> construction plans and right-of-way maps, <br /> (d) existing easement maps and documents, and <br /> (e) TxDOT permit requirements. <br /> 1.2.2 Compile information into a computer generated base map. <br /> 1.2.3 Walk potential alignments on the Project site to verify information on the base map. <br /> 1.2.4 Review Environmental Impact Statement prepared by TxDOT for project. <br /> Topographic Survey <br /> <br /> 1.2.5 Survey and calculate water and wastewater line alignments using the benchmarks <br /> provided by the City. <br /> 1.2.6 Produce contour map based on the City's coordinate system. <br /> Easement Preparation <br /> <br /> 1.2.7 Perform deed research as necessary to determine ownership of property required <br /> for easements. <br /> 1.2.8 Prepare plats and field note descriptions, in triplicate originals, of six permanent <br /> utility and temporary construction easements. <br /> 1.2.9 Provide the plats and descriptions to the City for preparation of easement <br /> documents. <br /> 2 <br /> ---~- ----- <br />