My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1998-236
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1998
>
Res 1998-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2007 3:18:39 PM
Creation date
4/27/2007 2:12:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1998-236
Date
12/21/1998
Volume Book
135
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> prepare necessary change orders in triplicate originals for approval by the City and <br /> execution in accordance with the construction contract documents. Architect will not issue <br /> change orders not previously approved in writing by City, and no course of conduct on the <br /> part of Architect or City will amend, waive or alter this provision. <br /> 1.4.18 Conduct professional inspections to determine the dates of substantial completion <br /> and final completion for the Project, to evaluate the work for acceptable conformance with <br /> the construction contract documents and in light of any subsequent tests performed as <br /> described in Subsection 1.4.14 to verify that any minor deviations from the construction <br /> contract documents as described in Subsection 1.4.14 have been corrected and that the <br /> reasons for any specific qualifications in any and all previous certificates for payment as <br /> described in Subsection 1.4.14 hereof are either no longer valid or the condition(s) and/or <br /> probJem(s) have been corrected; shall receive and review written warranties and related <br /> documents required by the construction contract documents and assembled by the <br /> Contractor; will issue final certificates for payment or take other appropriate action; and will <br /> make a written recommendation to the City regarding City's acceptance of the Project. <br /> 1.4.19 Require the submission by the Contractor, and subcontractors performing work on <br /> the Project site, of periodic wage rate payment reports and, with the City's assistance, <br /> verify compliance with federal and state wage rate requirements for the Project; and notice <br /> the City of any noncompliance, or of the failure by the Contractor or subcontractor's to <br /> make submissions. <br /> 1.4.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible <br /> record dr.awings showing significant changes in the work made during the construction <br /> phase. <br /> 1.4.21 Ensure that all notices and signs required and provided by the City are posted in <br /> the appropriate locations at the Project site. <br /> 1.4.22 Conduct final inspection with the City and prepare a punch list prior to final <br /> acceptance by the City. <br /> 1.4.23 Prior to the end of the one year warranty period, review the completed Project with <br /> the City and the Contractor and have all deficient items corrected. The extent of the duties, <br /> responsibilities and limitations of authority of the Architect as the City's representative <br /> during construction will not be modified or extended after the construction contract <br /> documents have been authorized by the City to be competitively bid without written consent <br /> of the City and the Architect and with notice to the Contractor. <br /> 1.5 ADDITIONAL SERVICES <br /> 1.5.1 Since the Architect's compensation is a fixed fee for Basic Services, including minor <br /> deviations from those described in this Agreement, compensation to the Architect for <br /> 6 <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.