Laserfiche WebLink
152. <br />DRAFT 6-4-03 <br /> <br />WATER UTILITY IMPROVEMENT AGREEMENT <br /> <br /> This Agreement is made on ., 2003 between the City of San Marcos (the <br />"City"), Bennett Realty Group ("Bennett"), and Dam Blanco Partnership ("Blanco') (referred to <br />individually as "Party" and collectively as the "Parties"). <br /> <br />RECITALS <br /> <br /> i. The City Council has approved a Wastewater Utility Improvement Agreement (the "Wastewater <br />Agreement") with Bennett, Blanco, and other parties to jointly participate in funding the costs of the <br />North IH-35 Wastewater Improvements Project. <br /> <br /> 2. In connection with the Wastewater Agreement, the City Council agreed to consider a request by <br />Bennett and Blanco for an agreement under which Bennett and Blanco would construct improvements <br />to the City's water system, and the City would reserve capacity in the improvements to serve the tracts <br />of real property owned by Bermett and Bianco as depicted on the map attached as Exhibit A in <br />accordance with this Agreement. The Parties have determined that these water system improvements <br />will consist of the following: <br /> <br />The North IH-35 Water Line Project (the "Project"), consisting ora) approximately 2,250 linear feet of 16" <br />and approximately 1,250 linear feet of 12" water main from the City's existing water main along IH-35 North <br />to the propelV of Bennett/Blanco, and associated materials, equipment, and appurtenances (the "IH-35 <br />Facilities"), and b) approximately 15,000 linear feet of 16" water main fi'om the City's existing water main <br />along Post Road to the property of Bennett/Blanco, and associated materials, equipment, and appurtenances <br />(the "Post Road Facilities"), the IH-35 Facilities and the Post Road Facilities being referred to collectively <br />in this Agreement as the "Facilities". <br /> <br /> 3. The Parties anticipate that the Project will be constructed in two distinct phases. The IH-35 <br />Facilities will be constructed in the near future as Phase 1 of the Project, to allow Bennett and Blanco <br />to utilize existing available capacity in the City's 16" water line in IH-35 North. The Post Road <br />Facilities will be constructed as Phase 2 of the Project at a time when capacity in the City's 16" water <br />line in IH-35 North needs to be supplemented by additional capacity provided by the City's 16" water <br />line in Post Road to provide adequate service to the property owned by the Parties. <br /> <br />AGREEMENT <br /> <br /> The Parties, in consideration of the mutual promises, covenants and agreements set forth in this <br />Agreement, agree and contract as follows: <br /> <br />1. Phase 1 - IH-35 Facilities <br /> <br /> 1.1 Engagement of Engineer. Bennett and Blanco agree to contract for and pay for all engineering <br />services needed for construction of the IH-35 Facilities (Phase 1 of the Project), including, without <br />limitation, the preliminary design, final design, bidding, construction administration, and warranty <br />inspection phases for this phase of the Project. The engineer engaged by Bennett and Blanco (the "IH-35 <br />Facilities Engineer") must be a professional engineer registered in the State of Texas. <br /> <br /> <br />