Laserfiche WebLink
<br /> 15"/ <br /> SECTION II. RELEASE INCIDENT SUMMARY (continued) <br /> YES / NO For YES or NO answers., please circle response in the left hand column. <br /> YES /NO 15. Have monitor wells been installed at this site? If yes: <br /> a. N umber of monitor wells installed to date: 34 <br /> b. N umber of monitor wells installed during the billing period of this application: None <br /> c. Diameter of monitor wells installed: N/A <br /> d. DeDth of monitor wells installed: N/A <br /> YES / NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump-treated (2 systems) <br /> b. Date system installed: 04 /92 <br /> c. System start UD date: 05 /92 <br /> YES/NO 17. Have anv technical reDOrts been prepared for this site? <br /> YES/NO 18. Has a technical report been prepared and submitted to the TNRCC for the phase of work completed for the billing <br /> oeriod of this application? If yes, complete Section ill, Technical ReDort Summary. <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> Sarnplin~ and analYtical services have been on~oin~. with administrative support utilized and eQuipment <br /> purchases kept to minimum while ensurin~ adequate monitorinf¡ . <br /> <br /> <br /> <br /> \ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES/NO 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> YES/NO 21. Will new tanks be installed at this site? If yes. indicate proposed date: <br /> <br /> YES/NO 22. Were the activities and costs being submitted in this claim preapproved by the TNRCC? If yes, by whom: <br /> TNRCC APPUCATION FOR REIMBURSEMENT E-Z FORM 8 <br /> TNRCC-Û230-EZ (Revised 09-û 1.9 5) <br />