Laserfiche WebLink
<br /> UU <::". ~V <br /> ~~~~ Installation Summary I <br /> . <br /> 1 Municipal Building Per Primary Site; Router 2 $750.00 $1,500.00 <br /> Per Primary Site; CSU/DSU Tl 4 $350.00 $1,400.00 <br /> Per Primary Site; Router Cards 3 $400.00 $1,200.00 . <br /> Per Primary Site; Switch 3 $350.00 $1,050.00 <br /> Per Primary Site; Server 2 $3,000.00 $6,000.00 <br /> 2 City Hall Per Primary Site; Switch 1 $350.00 $350.00 <br /> Per Primary Site; CSU/DSU T1 0 $350:00 $0.00 <br /> .--- Per Primary Site; Switch 1 $350.00 $350.00 <br /> 3 Public Works Building Per Primary Site; Switch 1 $350.00 $350.00 <br /> Per Primary Site; CSU/DSU T1 0 $350.00 $0.00 . <br /> Per Primary Site; Other 0 $0.00 <br /> 4 Electric Utility Per Primary Site; Router 1 $750.00 $750.00 : <br /> Per Primary Site; CSU/DSU T1 1 $350.00 $350.00 <br /> .- Per Primary Site; Switch 1 $350.00 $350.00 <br /> 5 Police Station Per Primary Site; Router 1 $750.00 $750.00 <br /> Per Primary Site; CSU/DSU T1 1 $350.00 $350.00 <br /> Per Primary Site; Other 0 $0.00 <br /> 7 PC's NICs Only 62 $50.00 $3,100.00 <br /> I Installation Total $17,850.001 <br /> Host Sit~: 1 <br /> Remote Sites: 1 <br /> Quote # 409971g1 <br /> WiITel ConvnUnications Systems - Data <br /> - 6- <br />