My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1997-109
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1997
>
Res 1997-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2007 3:58:41 PM
Creation date
6/11/2007 3:58:41 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1997-109
Date
6/23/1997
Volume Book
129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> foil- <br /> MGD capacity as of the date of the notice. The City and GBRA shall <br /> review this reservation annually, and the City Manager and the GBRA <br /> General Manager may, without having to modify this Agreement, from <br /> time to time extend and/or otherwise modify the City's reservation <br /> of treatment capacity for GBRA from and out of the portion of the <br /> treatment capacity constructed for the City. GBRA shall be free to <br /> rely upon the availability of the 1.5 MGD capacity during the term <br /> of the GBRA Reservation, as such term may be extended, for purposes <br /> ! of contracting with third parties for the sale of treated surface <br /> , water from the Plant. Provided, however, that all such contracts <br /> I with third parties shall either terminate upon the expiration of <br /> the GBRA Reservation or GBRA shall present the City simultaneously <br /> with a copy of any such contract a written request for at least a <br /> Minimum Plant Expansion to be operational by a date certain, such <br /> date to be not earlier than eighteen (18) months from the date the <br /> City receives such request and not later than the expiration of the <br /> GBRA Reservation. GBRA shall pay the City for treated water made <br /> available out of said 1.5 MGD capacity in accordance with Section <br /> 23 of this Agreement. <br /> Section 8. Raw Water Delivery System Capacity for the City. <br /> GBRA shall reserve for the City through the term of. this <br /> Agreement conveyance capacity of 9 MGD in the pipeline or pipelines <br /> constructed for the initial phase of the Raw Water Delivery System. <br /> GBRA shall also reserve for the City throughout the term of this <br /> Agreement pumping capacity of 6 MGD plus any additional pumping <br /> capacity that may be requested by and installed for the City from <br /> time to time, up to a total maximum pumping capacity reserved for <br /> the City of 9 MGD, subject to the reservation for GBRA of a portion <br /> of such capacity pursuant to Section 9, below. <br />r Section 9. GBRA's Use of the Raw Water Delivery System. <br /> <br />: Subject only to the reservations of capacity for the City set <br />, <br /> forth in Section 8, above, GBRA shall have the absolute right to <br /> use the Raw Water Delivery System to divert raw water from the <br /> Guadalupe River and other sources that may be agreed upon by GBRA <br /> and the City and to convey and deliver raw water to the Plant or to <br /> any person or location desired by GBRA. Additionally, GBRA shall <br /> also have the right to use raw water pumping capacity in the <br /> pumping facilities located at the Point of Diversion in the amount <br /> of 1.5 MGD, from and out of the portion of the capacity installed <br /> and reserved for the City during the term of the GBRA Reservation <br /> described in Section 8 above. The City and GBRA shall review this <br /> reservation of conveyance capacity annually, and the City Manager <br /> and the GBRA General Manager may, without having to modify this <br /> Agreement, from time to time extend and/or otherwise modify the <br /> City's reservation of pumping capacity for GBRA from and out of the <br /> portion of the pumping capacity installed for the City. <br /> Notwithstanding anything contained in this Section 9 to the <br /> contrary, no interconnection by which GBRA supplies raw water from <br /> -9- <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.