Laserfiche WebLink
<br /> PRELIMINARY COST ESTIMATE (2/19/97) <br /> IH35 Northbound Ramp Reversal between Center Point Road and Posey Road <br /> Developer: Tanger Factory Outlet Center <br /> Prepared by: Civil Engineering Consultants (Matt Van Wicklen,P.E.) <br /> UNIT QTY UNIT PRICE TOTAL <br /> O-adway Items <br /> Asph Cone Pvmnt MG 2270 $44.00 $99,880.00 <br /> Curb M 305 $32.80 $10,004.00 <br /> Grading Items <br /> Excav & Embank M3 6690 $5.25 $35,122.50 <br /> Salv & Haul RAP M2 2550 $6.00 $15,300.00 <br /> Topsoil & Seed M2 1840 $1.20 $2,208.00 <br /> Grading HR 32 $50.00 $1,600.00 <br /> Drainage Items <br /> Inlets EA 2 $5,000.00 $10,000.00 <br /> 600 mm RCP M 150 $131.25 $19,687.50 <br /> Riprap M3 7.65 $196.50 $1,503.23 <br /> Signage & Pavement Marking Items <br /> Remove Exist Mrkngs M 1005 $6.50 $6,532.50 <br /> New Pvmnt Mrkngs M 1525 $3.30 $5,032.50 <br /> Relocate Small Signs EA 10 $200.00 $2,000.00 <br /> Relocate Large Signs EA 5 $1,000.00 $5,000.00 <br /> New Plywd Signs M2 14 $215.00 $3,010.00 <br /> Delineators EA 20 $40.00 $800.00 <br /> Barricades & Traffic Handling MO 3 $4,000.00 $12,000.00 <br /> Cone Traffic Barrier(M&R; M 300 $30.00 $9,000.00 <br /> VIA Barrels EA 20 $350.00 $7,000.00 <br /> Mobilization (8%) LS 1 $18,374.42 $18,374.42 <br /> TOTAL $264,054.64 <br /> EXHIBIT A <br /> Page 7 of 10 <br />