Laserfiche WebLink
<br /> TJL <br /> SECTION ill. RELEASE INCIDENT SUl\.1ìYIARY (continued) <br /> @~)¡ NO For YES or NO answers, please circle response in the left hand column. <br /> @'NO 15, Have monitor wells been installed at this site? If yes: <br /> a, Number of monitor wells installed to date: lLl-;:¡rtive <br /> b, Number of monitor wells installed during the billing period of this application: none <br /> c. Diameter of monitor wells installed: n/;:¡ <br /> d. Depth of monitor wells installed: n/a <br /> <br /> @/NO 16. Has a soil and/or groundwater remediation systems been installed at this site? ,. <br /> a. Type of system installed: Pump treated (2 systems) <br /> b. Date system installed: I 04 I 92 <br /> c. System start up date: / ()C) / g? <br /> .. <br /> @NO 17. Have any technical reports been prepared for this site? <br /> ~/NO 18, Has a technical report been prepared and submitted to the TNRCC for the phase of work completed for the <br /> billing period of this application? If yes, complete Section IV, Technical Report Summary. <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> <br /> ~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES@ 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> YES@ 21. Will new tanks be installed at this site? If yes, indicate proposed date: . <br /> YES@ 22, Were the activities and costs being submitted in this claim pre-approved by the TNRCC? If yes, by <br /> whom: . <br /> TNRCC APPUCATION FOR REIMBURSE.'vŒNT E-Z FORM 12 <br /> TNRCC..{)230-EZ (11-01-94) <br />