Laserfiche WebLink
<br /> -' <br /> '6Þ <br /> 2.3 The CITY will designate the City Engineer-as the CITY's representative to act in the <br /> CITY's behalf with respect to the Project. The CITY and/or such authorized representative <br /> will examine the documents submitted by the ENGINEER and will render responses <br /> pertaining thereto promptly and provide the ENGINEER with the requested data or <br /> information in CITY's possession relating to the Project. <br /> 2.4 The CITY will provide access to and make all necessary provisions for the <br /> ENGINEER to enter public and private property as required for the ENGINEER to perform <br /> its services under this Agreement. <br /> 2.5 The CITY will furnish all legal, accounting and insurance counseling services as may <br /> be necessary at any time for the Project, including such auditing services as the CITY may <br /> require to ascertain how or for what purposes the Contractor used the money paid by or <br /> on behalf of the CITY. <br /> 2.6 The CITY will furnish required information and will render responses and conduct <br /> its review of written materials as expeditiously as possible. <br /> 2.7 The CITY will pay all costs incident to obtaining bids or proposals from Contractors <br /> (e.g., legal notice requirements and the provision of the City facilities for pre-bid <br /> conferences) . <br /> ~ <br /> 2.8 The CITY will either direct the ENGINEER to perform any additional services <br /> necessary to complete the Project or will furnish those services itself. <br /> 2.9 CITY will bear all costs incident to this Article. <br /> 2.10 The CITY will provide its standard construction contract documents, which do not <br /> include plans or technical specifications, to the ENGINEER when the ENGINEER <br /> commences work on preparing the construction contract documents, Subsection 1.2.5. <br /> ARTICLE 3 <br /> CONSTRUCTION COST <br /> 3.1 DEFINITION <br /> 3.1.1 The construction cost will be the total cost or estimated cost to the CITY of all <br /> elements of the Project designed or specified by the ENGINEER. <br /> 3.1.2 The construction cost will include at current market rates, including a reasonable <br /> allowance for overhead and profit, the cost of any equipment which has been designed, <br /> specified, selected or specially provided for by the ENGINEER, except that used materials <br /> and equipment will be included as if purchased new for the Project. <br />