Laserfiche WebLink
<br /> 1~£ <br />10. List the number of existing and/or proposed metered and non-metered connections (by size). <br /> This information is valid as of: (date of last customer count) <br /> , <br /> \Vater System Sewer System <br /> Connection Existing Proposed Connection Existing Proposed <br /> Non-Metered -- -- Residential 4,998 -- <br /> 5/8" or 3/4" meter 5,~87 -- Commercial 1,125 -- <br /> I" meter ~l ~ -- Industrial -- -- <br /> 1 Y2" meter 84 -- Other: -- -- <br /> 2" meter 209 -- <br /> 4" meter 23 -- <br /> Other. 7 -- <br /> I Total Water I 6,123 I -- II Total Sewer I 6,123 I -- I <br /> <br />11. ID1°U currently purchase water or sewe< "'atment capacity from another source? <br /> No. (skip the rest of this question and go to the next one) <br /> Yes - Water Purchased on a ( )regular - ( )sfasonal- ( )emergency basis <br /> . Source: t.I/l~ % of total supply: <br /> . Source: N/A % of total supply: <br /> DYes - Sewer treatment capacity Purchased on a ( )regular - ( )seasonal - ( )emergency basis <br /> <br /> . Source: % of total treatment <br /> ~ <br /> G" Provide a copy of the water or sewer treatment capacity purchase agreement or contract. <br />12. For the water and/or sewer system's compliance with minimum standards, please provide the fol1O\ving informat')n: <br /> A. <br /> . <br /> . . <br /> .~ <br /> B. <br /> . <br /> C. For each system, attach a copy of the plans specifications or plat approval letter of required from a city, county <br /> and state agency. <br /> D. For each system, attach a copy of the most recent inspection report letter. If necessary, also include a copy of <br /> the utility's response to that letter. <br /> E. For any system deficiencies, attach a brief explanation listing the actions taken or being taken by the utility to <br /> correct the listed deficiencies, including the proposed completion dates. <br /> F. If the system is operating and over 85% of minimum standard capacity for any facility component for the current <br /> number of customers, attach an explanation listing of actions to be taken to make system improvements including <br /> proposed completion dates. <br />CCN.APP (Rev. 12195) Page ~ of 10 <br />