Laserfiche WebLink
<br /> ft;zD <br /> - <br /> REVISED 6/7/96 <br />XI ITEHIZED BUDGET (With/Street lights) <br /> TRAIL SYSTEM <br /> Hike and Bike Trails $' 92,000 <br /> Trail parking Filt=ation /Detention 32,000 <br /> Pedest=ian Bridges <br /> B=idge ~ ~5,400 <br /> Bridge 2 ~2,200 <br /> Landscape/Xeriscape Ga=dens ~75,000 <br /> Signage 5,000 <br /> Lighting (Trails) ~50,000 <br /> ." SUB-TOTAL $ 48~,600 <br /> DOWNTOWN LINKS <br />Proposed downt:own i~"7Zprovemen t: s include: . <br />~. t:he replacement: of exist:ing sidewalks wit:h sidewalks of <br /> concret:e wit:h brick accent: bands. <br />2. Limi t: ed light:ing improvement:s. <br />3. A~~ improvement:s required in accordance wi t:h ADA. <br />4. Limit:ed landscape improvement:s including t:rees" grat;es and <br /> drip irrigat:ion (San Ant:onio St: on~y) <br />5. Addit:ion of landscape is~ands at: t:he end of each block t:o <br /> faci~it:at:e handicapped accessibilit:y <br />6. Rest:riping of parking spaces t:o include handicapped parking <br /> as required on each block. <br />7. Light;ing improv~"7Zent:s including t;he replacement; of wooden post: <br /> wit:h cast: iron ornament:al pedest:rian light:ing <br />Hist:oric Court:house Square E. Hopkins St:{200 & 300 blk) <br /> Sidewalk Concrece Work 82,000 Sidewalk Concrece work 56,000 <br /> Mdson=y 41,000 Mdson=y 20,000 <br /> Landscaping/Irrigacion 20,000 Landscaping/Irrigacion 5,000 <br /> Signage 1,000 Signage 555 <br /> E~ecèrica~ 33,250 Elec::rical 9,000 <br /> Ligb.t:ing 19,000 wat:erproo:ing/sealancs 3,000 <br /> wacerproo£ing/sealan::s 5,000 <br />Sub-èoca~ $201,250 SUb-èoèal $93,555 <br />