Laserfiche WebLink
<br /> SECTION II. RELEASE INCIDEI\7 SUl\-IMARY (continued) .s- (p fs, <br /> YES 1 NO For YES or NO answers, please circle response in the left hand column. <br /> §/NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34 <br /> b. Number of monitor wells installed during the billing period of this application: None <br /> c, Diameter of monitor wells installed: nJa <br /> d. Depth of monitor wells installed: nfa <br /> ,~fNO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: pump-treated (2 svstems) <br /> b, Date system installed: 04 f 92 <br /> <br /> c. Svstem start UP date: 05192 <br /> QVNO 17. Ha,'e anv technical repOIts been prepared for this site? <br /> (~NO 18. Has a technical report been prepared and submitted to the TNRCC for ú'1e phase of work completed for the billing <br /> period of this application? If\"es, complete Section III, Technical Report Summarv, <br /> 19. Pro,'ide a brief summary of the activities that ha,'e been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> Sampling and analvtical ser.ices have been on!wing. \\ith administrative support utilized and equipment <br /> purchases kept to a minimum while ensuring adequate monitoring. , <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES &j 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> YES ;~ð 21. Will new tanks be installed at this site? If ves, indicate proposed date: <br /> YES 16 22, Were the acti\ities and CO5L5 being submitted in this claim preapproved by the TNRCC? If yes, by <br /> whom: <br /> n:RCC APPLICATIO;-': FOR REI~!BCRSE~!E:--"l E-Z FOi<...\f 9 <br /> n:RCC-O230-EZ (Re\;sed 09-01-95) <br />