<br /> 6-&':r <br /> Preliminary Water Treatment Plant Design Report <br /> 1.2.46 Prepare a preliminary design report incorporating the water quality analysis, <br /> treatability studies, intake location site, raw water pipeline location, raw water terminal <br /> storage, water treatment plant site evaluation, water treatment plant evaluations, water <br /> treatment plant operations plan, distribution system impacts, and system-wide control <br /> strateg ies. <br /> 1.2.47 Develop an overall plant layout including hydraulic profiles, preliminary process and <br /> instrumentation diagrams, a preliminary control strategy to describe the proposed plant <br /> operations and controls, and a preliminary equipment list. Preliminary electrical loads for <br /> the current and future plant expansions will be determined to ensure that sufficient <br /> electrical transmission facilities are extended to the site. Preliminary architectural layouts <br /> and elevations of the new buildings will be made, a preliminary drainage and site grading <br /> plan will be developed, a preliminary opinion of total cost will be developed, and a <br /> preliminary implementation schedule will be developed. Options and alternatives will be <br /> identified to allow staging of the overall Project if required. Preliminary opinions of annual <br /> operating costs will be included. <br /> 1.2.48 Prepare a Preliminary Design Report to include the population and water use <br /> projections included in the HDR Surface Water Supply Study and it will be suitable for <br /> submission to the TNRCC for approval. . <br /> 1.2.49 Submit fifteen (15) copies of the Draft Preliminary Design Report to the City for <br /> review and comment. Submit Twenty- Five (25) copies of the Final Preliminary Design <br /> Report to the CITY. <br /> Workshops <br /> 1.2.50 Hold an initial brainstorming/planning workshop will be held in San Marcos for all <br /> parties involved with the Project. <br /> 1.2.51 Hold two intermediate quality control review workshops of one day each in San <br /> Marcos to review various components of the Project. <br /> 1.2.52 Hold a final review workshop in San Marcos to review the Preliminary Design <br /> Report. It is anticipated that this workshop will last two days. <br /> 1.2.53 Attend a Value Engineering workshop in San Marcos for up to two days duration <br /> and respond to Value Engineering comments. <br /> 1.2.54 Prepare minutes for all workshops and distribute to all attendees. <br /> 10 <br />