Laserfiche WebLink
<br /> ~ <br /> . , 37A <br /> Construction Administration Phase. - <br /> Centerpoint Area Water System Model <br /> <br /> The Engineer will: <br /> 1.2.2 Gather information on the existing water system and topography of the study area. <br /> 1.2.3 Prepare a watercadd model of the Centerpoint Area. <br /> ---. <br /> ¡ <br /> 1.2.4 Develop recommendations for water distribution and storage improvements. <br /> 1.2.5 Prepare letter report with exhibits outlining recommendations. <br /> Topographic Survey <br /> ~ <br /> . ' <br /> The Engineer will: <br /> 1.2.6 Survey the tank site and associated water lines. <br /> 1.2.7 Produce a contour map. <br /> 1.2.8 Coordinate survey performed by City personnel. . <br /> 1.2.9 Provide written field note descriptions of easements required for the Project. <br /> Design Water Storage Improvements and Associated Linework <br /> <br /> The Engineer will: <br /> f. 1.2.10 Design tank, site, associated linework, and transmission mains based on the water <br /> system model. <br /> - <br /> 1.2.11 Prepare plans and drawings of all improvements proposed. <br /> 1.2.12 Submit plans and drawings City for review. <br /> Construction Contract Documents <br /> The Engineer will: <br /> 1.2.13 Prepare construction contract using forms supplied by the City based on the <br /> approved design development documents and any further adjustments authorized by the <br /> City in the scope, quality or budget of the Project. These contract documents will include <br /> finalized, detailed plans and technical specifications and a bid sheet with quantities <br /> required for the Project to be accurately bid and efficiently constructed. <br />