My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2012-150
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2012
>
Res 2012-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2012 10:26:59 AM
Creation date
11/21/2012 2:02:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2012-150
Date
11/20/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for payment, and make recommendations for payment in these amounts, as provided in the <br />construction contract documents, or take such other appropriate action which the Engineer deems <br />necessary. <br />1.6.9 Make recommendations for payment that constitute a representation by the Engineer to <br />the City based on the Engineer's inspections and on the data comprising the Contractor's <br />application for payment, that 1) the work has progressed to the point indicated, 2) the quality of <br />the work is in acceptable conformance with the construction contract documents (subject to an <br />evaluation of the work of conformance with the construction contract documents upon <br />substantial completion, subject to the results of any subsequent tests required by or performed <br />under the construction contract documents, subject to minor variations from the construction <br />contract documents correctable prior to completion, and subject to any specific qualifications <br />stated in the certificate for payment), and 3) the construction contractor is entitled to payment in <br />the amount certified. However, the issuance of a certificate for payment will not be a <br />representation that the Engineer has made any examination to ascertain how and for what <br />purpose the Contractor has used the monies paid by the City. <br />1.6.10 Have authority to reject work, which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the <br />approval of the City, the Engineer will have authority to require special inspection or testing of <br />the work in accordance with the provisions of the construction contract documents, whether or <br />not such work is then fabricated, installed or completed. The Engineer will review the work and <br />results of all testing laboratories as required by the construction contract documents. <br />1.6.11 Review and make decisions regarding the approval or taking of other appropriate action <br />upon the Contractor's submittals, including, but not limited to, shop drawings, product data and <br />samples, schedule of values and progress schedule. The Engineer will take such action with <br />reasonable promptness, but generally not to exceed 15 calendar days or such period of time as <br />will not cause delay of the Project. <br />1.6.12 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. The Engineer will not issue change orders <br />not previously approved in writing by the City, and no course of conduct on the part of the <br />Engineer or the City will amend, waive or alter this provision. <br />1.6.13 Answer 10 Requests for Information from the Contractor, which may include technical <br />questions, clarifications and interpretations of the construction contract documents. <br />1.6.14 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as referenced in <br />the Section 1.6.9 to verify that any minor deviations from the construction contract documents as <br />REP Agreement 11/12 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.