My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-160
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2007 4:32:51 PM
Creation date
6/26/2007 4:32:51 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
1995-160
Date
9/11/1995
Volume Book
120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> /09 (y <br /> YES NO <br />D. Changes in the original Special Conditions P<J [J <br /> 1. If applicable, are all agency review special conditions and the <br /> original wage rate decision still valid on the proposed amended <br /> project? <br />If NO, then resubmit documentation to the appropriate agency for further action prior to <br />submitting this amendment request or request an updated wage rate decision from the <br />Department. <br />E. Public Participation Requirements <br /> Do any of the following conditions apply? YES NO <br /> 1. Substantial increase/decrease in the number or percentage [J Þ<1 <br /> of low and moderate income beneficiaries <br /> 2. Beneficiaries outside of the original target area [J Þ<] <br /> 3. Change in type of activity [J Þ<J <br />If a response to any of the above questions was YES, then a public hearing is required. <br />Please refer to Attachment 4-C for a sample public hearing notice, which must be published at <br />least 72 hours prior to the hearing. If a public hearing is necessary, one of the following must <br />be submitted with this amendment request: 1) a publisher's affidavit of. public hearing notice <br />with a copy of the actual publication; or 2) the full-page from the newspaper in which the notice <br />appeared. <br />F. How will the amendment work be accomplished? <br />Bid Alternate [ J Change Order [J Bid Þ<J Re-bid [J Force Account [ J <br />Important: If a Change Order is utilized, please submit a preliminary draft of the Change <br />Order for approval prior to executing this document with the Construction Contractor. <br />G. Assurance of Completion of the Project Within the Two-year Limit YES NO <br /> 1. Can the proposed amended project be accomplished within the [J M <br /> original two-year contract period? <br />If NO, please contact your TCDP representative prior to submitting the amendment request. <br />Amendments for additional work are generally not approved if the proposed work cannot be <br />completed within the original two-year contract period; however, each request will be reviewed <br />on a case-by-case basis. <br /> 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.