Laserfiche WebLink
<br /> . <br /> /(jc, <br /> performance bond(s) are permitted. <br /> 1.4.2 Be a representative but not an agent of the CITY during the construction phase, and <br /> advise and consult with the CITY and provide progress reports and advice to the CITY in <br /> writing; forward the CITY's instructions to the Contractor unless (1) ENGINEER is <br /> unavailable by telephonic communication or otherwise to issue instructions necessary for <br /> the proper progress and acceptance of work; (2) jeopardy to life and/or property exists; <br /> and/or (3) lack of instructions and/or unavailability of ENGINEER will result in, in CITY's <br /> opinion, harm to CITY, in which case instructions may be forwarded directly to the <br /> Contractor by the CITY; have authority to act on behalf of the CITY only to the extent <br /> provided herein and in the construction contract documents unless otherwise modified by <br /> written instrument in accordance with Section 11.1 Any instructions issued directly by <br /> .CITY to Contractor will be promptly communicated to the ENGINEER if the ENGINEER <br /> was unavailable at the time òf issuance of instructions. <br /> 1.4.3 Conduct a pre-construction conference with the Contractor and members of CITY's <br /> staff, to establish construction schedules and to identify key representatives of the parties <br /> and lines of communication. <br /> 1.4.4 Make on-site observations of the Project periodically to ensure familiarity with the <br /> progress and quality of the work, to determine if the work is proceeding in accèptable <br /> conformance with the construction contract documents, and to review the work with the <br /> CITY's designated representatives. On the basis of such on-site observations by the <br /> ENGINEER, the ENGINEER will keep the CITY informed of the progress and quality of the <br /> work through written field reports and weekly meetings with the CITY's representative; and <br /> will also be reasonably available to perform site visitations at the specific request of the <br /> CITY by the next business day after a request is made. <br /> 1.4.5 Not have control or charge of and will not be responsible for construction means, <br /> methods, techniques, sequences or procedures, or for safety precautions and programs <br /> in connection with the work, for the acts or omissions of the Contractor, subcontractors or <br /> any other persons performing any of the work, or for the failure of any of them to carry out <br /> the work in accordance with the construction contract documents unless such acts or <br /> omissions are due to the negligence of the ENGINEER or are acts or omissions under the <br /> ENGINEER's control. However, ENGINEER will exercise its authority on behalf of CITY <br /> in accordance herewith and particularly during the construction phase so that all work <br /> performed by the Contractor results in a Project completed in accordancE? with the <br /> construction contract documents, and during any phase should the ENGINEER become <br /> aware of the Contractor's utilization of means, methods, techniques, sequences and/or <br /> procedures of construction which, in ENGINEER's opinion, will not result in completion of <br /> the Project in accordance with the construction contract documents or which are unsafe, <br /> ENGINEER will immediately inform the CITY and will take all necessary action which the <br /> ENGINEER is authorized under this Agreement to take to correct the matter. In such <br /> situations, the ENGINEER will have the right and power, with the concurrence of the CITY, <br /> to immediately cease the work by Contractor on the Project. <br />