Laserfiche WebLink
<br /> J 3/<- I <br />SECTION ill. RELEASE INCIDENT SUM1\1ARY (continued) <br /> I <br />YES / NO For YES or NO answers, please circle response in the left hand column. <br />§NO 15. Have monitOr wells been installed at this site? If yes: I <br /> a. Number of monitor wells installed to date: 34 (acti.ve) <br /> b. Number of monitor wells installed during the billing period of this application: nonf> I <br /> c. Diameter of monitor wells installed: -NA- <br /> d. Depth of monitor wells installed: -NA- <br /> <br />@/NO 16. Has a soil and/or groundwater remediation systems been installed at this site? I <br /> a. Type of system installed: Pump treated (2 systems) --- <br /> b. Date system installed: / 04 / 92 I <br /> c. System start up date: / 05 / 92 <br /> .. <br />@/NO 17. Have any technical reports been prepared for this site? I <br />@'NO 18. Has a technical report been prepared and submitted to the TNRCC for the phase of work completed for the <br /> billing period of this application? If yes, complete Section IV, Technical Report SlllI11D4IY. 8 <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> II <br /> <br /> , II <br /> <br /> <br /> II <br /> <br /> <br /> II <br /> <br /> II <br /> <br /> <br /> II <br /> <br />YES /@ 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: II <br /> <br />YES@ 21. Will new tanks be installed at this site? If yes, indicate proposed date: . <br /> <br />YES@ 22. Were the activities and costs being submitted in this claim pre-approved by the TNRCC? If yes, by <br /> whom: ' . <br /> <br />TNRCC APPLICATION FOR REIMBURSEMENT E-Z FORM 12 <br />TNRCC..{)230-EZ (11..{) -94) <br /> - <br />