Laserfiche WebLink
<br /> SECTION ID. RELEASE INCIDENT SUMMARY (continued) GO/.- <br /> YES / NO For YES or NO answers, please circle response in the left hand column. <br /> @/NO 15. Have monitor wells been installed at this site? If yes: <br /> a. Number of monitor wells installed to date: 34-acti ve . <br /> b. Number of monitor wells installed during the billing period of this application: Nnnp <br /> c. Diameter of monitor wells installed: N/A <br /> d. Depth of monitor wells installed: N/A <br /> I@NO 16. Has a soil and/or groundwater remediation systems been installed at this site? <br /> a. Type of system installed: Pump treated (2 systems) <br /> b. Date system installed: / OLI. / q? <br /> c. System start up date: / 05 / 92 <br /> .. <br /> (~ /NO 17. Have any technical reports been prepared for this site? <br /> .~NO 18. Has a technical report been prepared and submitted to the TNRCC for the phase of work completed for the <br /> billing period of this application? If yes, complete Section IV, Technical Report Summary. <br /> 19. Provide a brief summary of the activities that have been performed to date and for activities for which <br /> reimbursement is sought in this application: <br /> <br /> , <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> YES@ 20. Have new tanks or lines been installed at this site? If yes, indicate date(s) of installation: <br /> ~ 21. Will new tanks be installed at this site? If yes, indicate proposed date: <br /> YES NO <br /> YES~ 22. Were the activities and costs being submitted in this claim pre-approved by the TNRCC? If yes, by <br /> whom: . . <br /> TNRCC APPUCATION FOR REIMBURSE.'vŒ."IT E-Z FORM 12 <br /> TNRCC-0230-EZ (11-01-94) <br />