My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-219
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2007 4:48:58 PM
Creation date
6/27/2007 4:48:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1995-219
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> (Z1L <br /> J. Ensure that no officer above the rank of Lieutenant will be reimbursed for <br /> enforcement duty. <br /> K. Support grant enforcement efforts with public inforII).ation and education. <br /> Enforcement salaries being claimed for PI&E activities must be included in the <br /> budget. <br /> L. Officers assigned to Speed STEP should be trained in the use of radar or laser <br /> speed measurement devices. <br /> M. Subgrantees with a Traffic Div~sion will utilize traffic personnel for this grant <br /> unless such personnel are unavailable for assignment. <br /> N. Prior to conducting a Speed STEP, select sites that comply with existing state <br /> and lor federaUy mandated limit (i.e., 30 mph, 55/65 mph) or are zoned in <br /> accordance with Vernon's Civil Statutes, Article 6701d, Section 167 (a)-(d) <br /> (i.e., ,35 mph, 40 mph, 45 mph, 50 mph). <br /> O. Conduct speed zone measurements to determine appropriate STEP sites, <br /> Measurements may be conducted prior to the beginning of the grant and a <br /> completed Operational Plan can be included and approved as a part of this <br /> attachment If the Operational Plan is included in the grant, written <br /> documentation'must be submitted with the grant to support the sites selected. <br /> Those departments choosing to conduct the measurements dunng the fITst <br /> month of the grant must submit a completed Operational Plan with supporting <br /> documentation within the first thirty (30) days of the grant. If the subgrantee <br /> selects the option of submitting the Plan within the first 30 days, no <br /> enforcement activity, with the excepcion of the measurements, may take place <br /> prior to receiving written Department approval of the Operational Plan, <br /> P. Ensure that salaries for employees reimbursed under this grant are either <br /> overtime payor additional hires. In no case will federal funds supplant (i.e., <br /> replace existing state or local expenditures with the use of federal grant funds) <br /> Subgrantee wages. <br />v. RESPONSIBILITIES OF THE DEPARTMENT: <br /> A. Monitor the Subgrantee's compliance with performance obligations and fiscal <br /> requirements of this grant. <br /> B. Provide program management and technical assistance as appropriate. <br /> C. Reimburse the Subgrantee for all eligible costs as defined in Attachment B, <br /> Approved Project Budget. Requests for Reimbursement will be processed up <br /> to the ma:umum amount payable as indicated on the cover page of the <br /> agreement. <br />SPEED.7/95 page 3 of ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.