Laserfiche WebLink
<br /> A TT A CHl\1ENT B (23 It... <br /> APPROVED PROJECT BUDGET FOR FY 96 <br /> SPEED STEP <br /> SUMMARY: <br /> TOTAL LABOR COSTS: $ 25.000 $ 7,883 $ 32.883 <br /> TOTAL OTHER DIRECT COSTS: $--L $ 3.474 $ 3.474 <br /> GRAND TOTAL: $ 25,000 $ 11.357 $ 36.357 <br /> FUND SOURCES: <br /> Federal Funds ( 69 9ó) Local Funds ( 31 %) <br /> $ 25,000.00 + $ 11.357,00 = TOTAL $ 36.357.00 <br /> < <br /> ,, ' <br /> SPEED,7/95 Page 3 of 3 <br />