Laserfiche WebLink
<br /> .. ('2-(,/1 <br /> Supplemental Agreement <br /> Bell & Howell <br /> Page 2 <br /> software or utilities necessary to run the computer system. <br /> Bell & Howell will be required to assign a project manager to <br /> oversee all aspects of equipment delivery, testing, and <br /> installation. Installation of hardware and software will be <br /> completed and the system fully operative to the satisfaction <br /> of the City before final payment will be made. Bell & Howell <br /> will be responsible to make prepaid delivery, unload, unpack <br /> or uncrate, set-up, and install equipment and remove all <br /> cartons or packing materials from the final destination at no <br /> additional expense to the City. <br /> 8. Documentation. Bell & Howell will provide one set of <br /> ,thorou':Jh documentation covering all aspects of hardware <br /> system operating, and software applications installed at the <br /> time of installation along with all licenses and original <br /> diskettes for software, including operational system and <br /> Windows. <br /> City of San Marcos, Texas Bell & Howell Company <br /> By: ~ ,¿l~ By: <br /> Larr D. illey,~ ~;-¡Cl ~ ./fle ql.7,J.(! ( SJtt' -> 'u( I¿ <br /> City Manager ¡JOLA5IJ <br /> Printed name, title <br /> August 15, 1995 If (7, 14<: <br /> Date Úat.e <br />