My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1995-223
San-Marcos
>
City Clerk
>
03 Resolutions
>
1990 s
>
1995
>
Res 1995-223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2007 8:26:09 AM
Creation date
6/28/2007 8:26:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
1995-223
Date
12/11/1995
Volume Book
121
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> , 301) D <br /> 6.00 POST CONSTRUCTION SERVICES <br /> The Post Construction Phase Services for each construction contract <br /> consists of reviewing the operations and maintenance manuals and reviewing <br /> the work during the one year correction period of each of the construction <br /> contracts. <br /> 6.01 O&M Manuals Update .. <br /> Review the Operations and Maintenance Manuals provided by the Design <br /> Consultants. Recommend revisions at the conclusion of the 10 month <br /> follow-up visits. <br /> 6.02 Visit the projects after they are complete to determi ne that warranty <br /> issues are addressed by the Construction Contractors. Services consist of <br /> four 1 days visits and follow-up with the Construction Contractors. <br /> { <br /> R:\CSBD\SMllC.DOC <br /> Exhi bit B - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.